Katerra, the fast-growing design, prefabrication construction and technology company, today announces its acquisition of Bristlecone Construction, a four-year-old, general contractor based in Littleton, Colo., that specializes in commercial and multifamily projects whose costs range from $500,000 to $55 million.
Terms of the acquisition were not disclosed.
Bristlecone, which will become known as Katerra, is a site-built contractor that brings efficiencies to projects through self-performance, technology, and innovative procurement. “This merger allows us to expand the value and services we already provide for our clients,” says Zach Smith, the contractor’s CEO.
Bristlecone, which currently employs 150 people, expects to double its size as a result of joining forces with Katerra, according to the Denver Business Journal.
Through this acquisition, Katerra expects to gain self-perform expertise in structural concrete and framing, and extend its construction reach in the central U.S.
The purchase of Bristlecone is the latest in Katerra’s efforts to fully integrate design, manufacturing, and construction delivery services. The company, which since its founding in 2015 has built a global team of 3,500 people, is in the process of opening several new plants in the U.S. that include a 250,000-sf facility on 29 acres near Spokane, Wash., for mass timber production.
Katerra, based in Menlo Park, Calif., has amassed $1 billion in investment capital, and is valued at more than $3 billion.
Related Stories
High-rise Construction | Apr 17, 2015
Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower
The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.
High-rise Construction | Apr 16, 2015
Construction begins on Seattle's Tibet-inspired Potala Tower
Construction on the 41-story Potala Tower in Seattle finally kicked off following a ground-breaking ceremony seven months ago.
Building Team Awards | Apr 10, 2015
14 projects that push AEC teaming to the limits
From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.
Building Team Awards | Apr 10, 2015
Prefab saves the day for Denver hospital
Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.
Building Team Awards | Apr 10, 2015
Anaheim’s soaring intermodal hub
Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.
Building Team Awards | Apr 10, 2015
Virtual collaboration helps complete a hospital in 24 months
PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.
Building Team Awards | Apr 10, 2015
New arts venue reinvigorates Virginia Tech's campus
The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.