flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Kameleon Color paint creates color-changing, iridescent exterior for Exploration Tower at Port Canaveral

Sponsored Content

Kameleon Color paint creates color-changing, iridescent exterior for Exploration Tower at Port Canaveral

Linetec finishes Firestone’s UNA-CLAD panels, achieving a one-of-a-kind, dynamic appearance with the first use of Valspar’s new Kameleon Color


By Valspar This is sponsored content   | March 21, 2014
Design architect GWWO selected Valspars Blue Pearl II color-changing paint to c
Design architect GWWO selected Valspars Blue Pearl II color-changing paint to capture the themes of revitalization and change i

With its shimmering, iridescent exterior, Exploration Tower at Port Canaveral, Fla., beckons visitors with its unique appearance as its color changes in different light and at different angles.

Opened in November 2013, the Port’s iconic welcome center showcases the first use of Valspar’s new Kameleon™ Color mica coating as spray-applied to Firestone Metal Products’ UNA-CLAD™ metal wall panels by Linetec, one the nation’s largest finishers of architectural aluminum.

An integral part of Florida’s Space Coast and Canaveral Cove’s revitalization, Exploration Tower is owned by Canaveral Port Authority. Its opening coincided with the Port’s 60th anniversary of its establishment and the 500th anniversary of Ponce de Leon’s landing on Florida’s east coast.

Taking its cues from the shapes and hues of the port, GWWO Inc./Architects designed the $23 million, seven-story, sail-shaped structure to express the common characteristics of “transience, function and imagery.” The building’s southern elevation soars from the water to the sky. It narrows in scale and reduces its exterior coverage until only the steel frame remains to outline the curvature and comes together at a peak 60-feet above the main roof level.

The architects elaborate, “The building’s dynamic form and features – sun louvers, exposed structure and iridescent skin -- contribute to a constant sense of movement as the sun plays across the structure, meet functional needs, and evoke imagery of the Port and [Brevard] County. A rocket ready to launch, a surfboard in the sand, a ship’s hull, a rocket contrail; all can be seen in the structure’s striking presence.”

 

 

Skanska USA served as the general contractor of the 23,000-sf project. Kenpat USA was the subcontractor responsible for the exterior metal façades and wall system. Working closely with Kenpat, Firestone engineered and fabricated the façade’s metal panel system. 

Radius Track Corporation fabricated the curved structural faming and provided the 3-D building information modeling (BIM) to coordinate the connection points for each panel in the building’s parabolic curve. In total, Kenpat installed 42 pre-fabricated structural panelized units as sub-structure for the cladding, with the largest being 36 feet by 10 feet.

GWWO selected Valspar’s Blue Pearl II color-changing paint to capture the themes of revitalization and change it sought to represent for the Port Canaveral area. Along with its unique appearance, the finish must withstand Florida’s hurricane wind speeds, unrelenting sun and salt spray.

Kameleon Colors offer the same, advanced protection as Valspar’s 70% PVDF Fluropon® product family in rich, pearlescent pigments that shift in color when viewed from different angles. Applied in a three-coat system, Kameleon colors consist of a primer, basecoat and color coat, and are available for both extrusion and coil products.

 

 

“When creating a unique design that requires a vibrant color scheme, Kameleon Color is an excellent choice. This innovative, multicolored system uses mica flakes to create a consistent, iridescent look,” notes Tim Tritch, Valspar’s director of sales. The coating utilizes a blend of ceramic and inorganic pigments create this rich look that is both brilliant and subtle.”

Linetec also applied a clear coat over the Blue Pearl II for enhanced durability. As with other 70% PVDF resin-based coatings, Kameleon Colors meet the most stringent, exterior, architectural specification, American Architectural Manufacturers Association’s AAMA-2605. This specification requires paint coatings to meet rigorous testing performance standards, including more than 2,000 hours of cyclic corrosion per ASTM G85 annex 5, and heat- and humidity-resistance. Per AAMA-2605, the coating also must maintain its film integrity, color retention, chalk resistance, gloss retention, and erosion resistance properties for a minimum of 10 years on the South Florida testing site.

“If anyone can spray this and make it look good, it would be Linetec,” said GWWO’s senior associate, John Gregg, AIA, LEED AP, AVS, during a project planning meeting.

Accepting the praise with confidence, Linetec’s paint plant manager Paul Bratz says, “No one has sprayed this before, but our knowledgeable staff was up to the challenge. There was some trial and error during the process. It was critical that each paint run maintained the same parameters. The spray conditions, paint prep and application consistency of the paint itself were all critical. The slightest change could alter the look of the paint.”

To ensure consistency and minimize variation, Linetec modified its existing paint protocol process. Bratz explains, “The amount of paint needed for the entire project was determined and ordered as a single batch at the beginning of the project. Valspar prepared the special mica technology paint all at one time with excellent consistency, taking out the variable of multiple paint batches.”

In addition to the Kameleon Colors’ Blue Pearl II finish on southern seaside elevation, Linetec also applied Valspar’s Fluropon White finish to the northern elevation’s aluminum-framed curtainwall offering views of the bustling port. The entire project was painted in four phases, starting in March 2013 and ending in May.

Owner: Canaveral Port Authority
Master planning: AECOM, GWWO Inc./Architects
Architect: GWWO Inc./Architects
General contractor: Skanska USA Building
Structural engineer: Thornton Tomasetti
Exterior cladding system – installing contractor: KENPAT USA LLC
Exterior cladding system – manufacturer: Firestone Metal Products
Exterior cladding system – 3-D modeling: Radius Track Corporation
Exterior cladding system – coatings manufacturer: The Valspar Corporation
Exterior cladding system – finisher: Linetec

Related Stories

Architects | Apr 6, 2023

Design for belonging: An introduction to inclusive design

The foundation of modern, formalized inclusive design can be traced back to the Americans with Disabilities Act (ADA) in 1990. The movement has developed beyond the simple rules outlined by ADA regulations resulting in features like mothers’ rooms, prayer rooms, and inclusive restrooms.

Market Data | Apr 6, 2023

JLL’s 2023 Construction Outlook foresees growth tempered by cost increases

The easing of supply chain snags for some product categories, and the dispensing with global COVID measures, have returned the North American construction sector to a sense of normal. However, that return is proving to be complicated, with the construction industry remaining exceptionally busy at a time when labor and materials cost inflation continues to put pricing pressure on projects, leading to caution in anticipation of a possible downturn. That’s the prognosis of JLL’s just-released 2023 U.S. and Canada Construction Outlook.

Cladding and Facade Systems | Apr 5, 2023

Façade innovation: University of Stuttgart tests a ‘saturated building skin’ for lessening heat islands

HydroSKIN is a façade made with textiles that stores rainwater and uses it later to cool hot building exteriors. The façade innovation consists of an external, multilayered 3D textile that acts as a water collector and evaporator. 

Market Data | Apr 4, 2023

Nonresidential construction spending up 0.4% in February 2023

National nonresidential construction spending increased 0.4% in February, according to an Associated Builders and Contractors analysis of data published by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $982.2 billion for the month, up 16.8% from the previous year. 

Sustainability | Apr 4, 2023

ASHRAE releases Building Performance Standards Guide

Building Performance Standards (BPS): A Technical Resource Guide was created to provide a technical basis for policymakers, building owners, practitioners and other stakeholders interested in developing and implementing a BPS policy. The publication is the first in a series of seven guidebooks by ASHRAE on building decarbonization.

Sustainability | Apr 4, 2023

NIBS report: Decarbonizing the U.S. building sector will require massive, coordinated effort

Decarbonizing the building sector will require a massive, strategic, and coordinated effort by the public and private sectors, according to a report by the National Institute of Building Sciences (NIBS).

Education Facilities | Apr 3, 2023

Oklahoma’s Francis Tuttle Technology Center opens academic center for affordable education and training

Oklahoma’s Francis Tuttle Technology Center, which provides career-specific training to adults and high school students, has completed its Francis Tuttle Danforth Campus—a two-story, 155,000-sf academic building. The project aims to fill the growing community’s rising demand for affordable education and training.

Sports and Recreational Facilities | Mar 30, 2023

New University of St. Thomas sports arena will support school's move to Division I athletics

The University of St. Thomas in Saint Paul, Minn., last year became the first Division III institution in the modern NCAA to transition directly to Division I. Plans for a new multipurpose sports arena on campus will support that move.

Warehouses | Mar 29, 2023

Construction completed on Canada’s first multi-story distribution center

Construction was recently completed on Canada’s first major multi-story industrial project, a distribution center in Burnaby, British Columbia. The project provides infrastructure for last-mile delivery in a world where consumers have come to expect next-day and same-day delivery, according to Ware Malcomb, the project's architect of record.

AEC Innovators | Mar 27, 2023

Leading architecture, engineering firm HED appoints new co-CEOs

As children of immigrant families, Van Herle and Suarez will bring a diverse perspective into a historically underrepresented industry and advance the firm’s mission of creating a positive impact for clients, communities, and the world.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021