Kameleon Color paint creates color-changing, iridescent exterior for Exploration Tower at Port Canaveral

Sponsored Content

Kameleon Color paint creates color-changing, iridescent exterior for Exploration Tower at Port Canaveral

Linetec finishes Firestone’s UNA-CLAD panels, achieving a one-of-a-kind, dynamic appearance with the first use of Valspar’s new Kameleon Color


By Valspar This is sponsored content   | March 21, 2014
Design architect GWWO selected Valspars Blue Pearl II color-changing paint to c
Design architect GWWO selected Valspars Blue Pearl II color-changing paint to capture the themes of revitalization and change i

With its shimmering, iridescent exterior, Exploration Tower at Port Canaveral, Fla., beckons visitors with its unique appearance as its color changes in different light and at different angles.

Opened in November 2013, the Port’s iconic welcome center showcases the first use of Valspar’s new Kameleon™ Color mica coating as spray-applied to Firestone Metal Products’ UNA-CLAD™ metal wall panels by Linetec, one the nation’s largest finishers of architectural aluminum.

An integral part of Florida’s Space Coast and Canaveral Cove’s revitalization, Exploration Tower is owned by Canaveral Port Authority. Its opening coincided with the Port’s 60th anniversary of its establishment and the 500th anniversary of Ponce de Leon’s landing on Florida’s east coast.

Taking its cues from the shapes and hues of the port, GWWO Inc./Architects designed the $23 million, seven-story, sail-shaped structure to express the common characteristics of “transience, function and imagery.” The building’s southern elevation soars from the water to the sky. It narrows in scale and reduces its exterior coverage until only the steel frame remains to outline the curvature and comes together at a peak 60-feet above the main roof level.

The architects elaborate, “The building’s dynamic form and features – sun louvers, exposed structure and iridescent skin -- contribute to a constant sense of movement as the sun plays across the structure, meet functional needs, and evoke imagery of the Port and [Brevard] County. A rocket ready to launch, a surfboard in the sand, a ship’s hull, a rocket contrail; all can be seen in the structure’s striking presence.”

 

 

Skanska USA served as the general contractor of the 23,000-sf project. Kenpat USA was the subcontractor responsible for the exterior metal façades and wall system. Working closely with Kenpat, Firestone engineered and fabricated the façade’s metal panel system. 

Radius Track Corporation fabricated the curved structural faming and provided the 3-D building information modeling (BIM) to coordinate the connection points for each panel in the building’s parabolic curve. In total, Kenpat installed 42 pre-fabricated structural panelized units as sub-structure for the cladding, with the largest being 36 feet by 10 feet.

GWWO selected Valspar’s Blue Pearl II color-changing paint to capture the themes of revitalization and change it sought to represent for the Port Canaveral area. Along with its unique appearance, the finish must withstand Florida’s hurricane wind speeds, unrelenting sun and salt spray.

Kameleon Colors offer the same, advanced protection as Valspar’s 70% PVDF Fluropon® product family in rich, pearlescent pigments that shift in color when viewed from different angles. Applied in a three-coat system, Kameleon colors consist of a primer, basecoat and color coat, and are available for both extrusion and coil products.

 

 

“When creating a unique design that requires a vibrant color scheme, Kameleon Color is an excellent choice. This innovative, multicolored system uses mica flakes to create a consistent, iridescent look,” notes Tim Tritch, Valspar’s director of sales. The coating utilizes a blend of ceramic and inorganic pigments create this rich look that is both brilliant and subtle.”

Linetec also applied a clear coat over the Blue Pearl II for enhanced durability. As with other 70% PVDF resin-based coatings, Kameleon Colors meet the most stringent, exterior, architectural specification, American Architectural Manufacturers Association’s AAMA-2605. This specification requires paint coatings to meet rigorous testing performance standards, including more than 2,000 hours of cyclic corrosion per ASTM G85 annex 5, and heat- and humidity-resistance. Per AAMA-2605, the coating also must maintain its film integrity, color retention, chalk resistance, gloss retention, and erosion resistance properties for a minimum of 10 years on the South Florida testing site.

“If anyone can spray this and make it look good, it would be Linetec,” said GWWO’s senior associate, John Gregg, AIA, LEED AP, AVS, during a project planning meeting.

Accepting the praise with confidence, Linetec’s paint plant manager Paul Bratz says, “No one has sprayed this before, but our knowledgeable staff was up to the challenge. There was some trial and error during the process. It was critical that each paint run maintained the same parameters. The spray conditions, paint prep and application consistency of the paint itself were all critical. The slightest change could alter the look of the paint.”

To ensure consistency and minimize variation, Linetec modified its existing paint protocol process. Bratz explains, “The amount of paint needed for the entire project was determined and ordered as a single batch at the beginning of the project. Valspar prepared the special mica technology paint all at one time with excellent consistency, taking out the variable of multiple paint batches.”

In addition to the Kameleon Colors’ Blue Pearl II finish on southern seaside elevation, Linetec also applied Valspar’s Fluropon White finish to the northern elevation’s aluminum-framed curtainwall offering views of the bustling port. The entire project was painted in four phases, starting in March 2013 and ending in May.

Owner: Canaveral Port Authority
Master planning: AECOM, GWWO Inc./Architects
Architect: GWWO Inc./Architects
General contractor: Skanska USA Building
Structural engineer: Thornton Tomasetti
Exterior cladding system – installing contractor: KENPAT USA LLC
Exterior cladding system – manufacturer: Firestone Metal Products
Exterior cladding system – 3-D modeling: Radius Track Corporation
Exterior cladding system – coatings manufacturer: The Valspar Corporation
Exterior cladding system – finisher: Linetec

Related Stories

Virtual Reality | Jun 16, 2023

Can a VR-enabled AEC Firm transform building projects?

With the aid of virtual reality and 3D visualization technologies, designers, consultants, and their clients can envision a place as though the project were in a later stage.

Mechanical Systems | Jun 16, 2023

Cogeneration: An efficient, reliable, sustainable alternative to traditional power generation

Cogeneration is more efficient than traditional power generation, reduces carbon emissions, has high returns on the initial investment, improves reliability, and offers a platform for additional renewable resources and energy storage for a facility. But what is cogeneration? And is it suitable for all facilities?

Office Buildings | Jun 15, 2023

An office building near DFW Airport is now home to two Alphabet companies

A five-minute drive from the Dallas-Fort Worth International Airport, the recently built 2999 Olympus is now home to two Alphabet companies: Verily, a life sciences business, and Wing, a drone delivery company. Verily and Wing occupy the top floor (32,000 sf and 4,000 sf, respectively) of the 10-story building, located in the lakeside, work-life-play development of Cypress Waters.

Transit Facilities | Jun 15, 2023

Arlington, Va., transit station will support zero emissions bus fleet

Arlington (Va.) Transit’s new operations and maintenance facility will support a transition of their current bus fleet to Zero Emissions Buses (ZEBs). The facility will reflect a modern industrial design with operational layouts to embrace a functional aesthetic. Intuitive entry points and wayfinding will include biophilic accents.

Urban Planning | Jun 15, 2023

Arizona limits housing projects in Phoenix area over groundwater supply concerns

Arizona will no longer grant certifications for new residential developments in Phoenix, it’s largest city, due to concerns over groundwater supply. The announcement indicates that the Phoenix area, currently the nation’s fastest-growing region in terms of population growth, will not be able to sustain its rapid growth because of limited freshwater resources. 

Multifamily Housing | Jun 15, 2023

Alliance of Pittsburgh building owners slashes carbon emissions by 45%

The Pittsburgh 2030 District, an alliance of property owners in the Pittsburgh area, says that it has reduced carbon emissions by 44.8% below baseline. Begun in 2012 under the guidance of the Green Building Alliance (GBA), the Pittsburgh 2030 District encompasses more than 86 million sf of space within 556 buildings. 

Industry Research | Jun 15, 2023

Exurbs and emerging suburbs having fastest population growth, says Cushman & Wakefield

Recently released county and metro-level population growth data by the U.S. Census Bureau shows that the fastest growing areas are found in exurbs and emerging suburbs. 

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

University Buildings | Jun 14, 2023

Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses

A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021