The Albert Kahn Family of Companies (Kahn), a leading provider of architecture, engineering, planning, design and management services, is pleased to announce that Alan Cobb, FAIA, LEED® AP has been named President & CEO.
Cobb is the tenth president in the firm’s 118-year history. As President, Cobb is responsible for ensuring that all of the firm’s client issues are effectively address and that overall project team performance meets or exceeds client expectations for each and job the firm undertakes.
Cobb is currently leading design efforts for the Detroit Zoo’s Penguin Conservation Center and Lawrence Tech’s Taubman Engineering, Life Sciences, and Architecture Complex, and was design principal for the Lear HQ Campus, the College for Creative Studies Taubman Center for Design (Argonaut Building Adaptive Re-use), the Delta Dental of Michigan HQ Office, and the O-I HQ Office Complex.
Since joining Kahn in 1976, Cobb has been involved in numerous projects, many of which have earned the firm awards and recognition for design excellence. With a passion for design, Cobb provides oversight to design professionals and continues to serve as a mentor to many young professionals within the firm and throughout the region.
Cobb was given the Lawrence Technological University Distinguished Architecture Alumni Award in 2000. He is a licensed architect in Michigan and 34 other states, a LEED Accredited Professional, and is certified by the National Council of Architectural Registration Boards. Cobb is currently resides in Troy, Michigan with his wife Mary.
Related Stories
| Mar 28, 2012
Milestone reached for LEED-certified buildings?
Total number of major global green buildings now stands at 12,000.
| Mar 28, 2012
Holden Cancer Center opens at University of Iowa Hospitals and Clinics
The new cancer clinic provides a significant increase in patient space from the prior facility, which was located in an adjacent building.
| Mar 28, 2012
Meridian Design Build Begins work on 38 acre redevelopment project
The project includes construction of a new 150,585-sf cross dock facility that will include full service truck maintenance and repair bays, a truck wash, and approximately 20,000-sf of corporate office space.
| Mar 28, 2012
Tsoi/Kobis & Associates developing master plan for UT Southwestern Medical Center
Firm will spearhead strategies for transforming existing in-patient hospital into state-of-the-art ambulatory care facility.
| Mar 28, 2012
Ideas and input drive stories in online community, noraXchange
Community designed to help building and design professionals address challenges they face in their jobs.
| Mar 27, 2012
Bank of America Plaza becomes Atlanta's priciest repo
Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.
| Mar 27, 2012
Skanska hires aviation construction expert Bob Postma
Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.
| Mar 27, 2012
Precast concrete used for affordable, sustainable housing in New York
Largest affordable housing development in the nation will provide housing for close to 500,000 people.
| Mar 27, 2012
Groundbreaking held for Valencia College West Campus Building 10 in Orlando
Project led by design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.
| Mar 27, 2012
Hollister Construction completes LEED Silver bank in Woodland Park, N.J.
Ground-up construction project included installation of solar panels.