More and more educators are being influenced by the Reggio Emilia approach to pedagogy, with its mantra of “environment as the third teacher”—an approach that gives Building Teams a responsibility to pay even closer attention to the special needs of today’s schools.
In addition to helping support the pedagogical aims of those owner institutions, Building Teams are also crafting new approaches to creating sustainable, high-performance K-12 schools. As school districts struggle to find the capital to build and maintain energy-efficient, healthy environments, K-12 project teams are developing strategies to help support high-performance educational facilities and stay on budget.
This approach begins with Building Teams taking an integrated approach where the architect, engineer, contractor, and building owner collaborate early on in the project and take a holistic approach to the design.
After reading this article, you should be able to:
- Discuss integrated design strategies that help make K-12 facilities more energy efficient and sustainable while reducing the cost of operations.
- Describe how current educational approaches inform school facility design, including sustainable design approaches. net-zero energy strategies, and the use of modular or prefabricated classrooms.
- List the various technologies, materials, and systems that create a learning tool out of building features and energymanagement systems. to design high-performance schools that emphasize student health and enhance classroom performance.
- Compare various design solutions and architectural features intended to encourage student interaction, physical activity and health, business community involvement, and the use of new technology in the classroom.
Take this free BDCuniversity course
Related Stories
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.
| Nov 11, 2011
By the Numbers
What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 11, 2011
AIA: Engineered Brick + Masonry for Commercial Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Nov 11, 2011
How Your Firm Can Win Federal + Military Projects
The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.
| Nov 10, 2011
BD+C's 28th Annual Reconstruction Awards
A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.
| Nov 10, 2011
Grousbeck Center for Students & Technology opens doors
New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.