More and more educators are being influenced by the Reggio Emilia approach to pedagogy, with its mantra of “environment as the third teacher”—an approach that gives Building Teams a responsibility to pay even closer attention to the special needs of today’s schools.
In addition to helping support the pedagogical aims of those owner institutions, Building Teams are also crafting new approaches to creating sustainable, high-performance K-12 schools. As school districts struggle to find the capital to build and maintain energy-efficient, healthy environments, K-12 project teams are developing strategies to help support high-performance educational facilities and stay on budget.
This approach begins with Building Teams taking an integrated approach where the architect, engineer, contractor, and building owner collaborate early on in the project and take a holistic approach to the design.
After reading this article, you should be able to:
- Discuss integrated design strategies that help make K-12 facilities more energy efficient and sustainable while reducing the cost of operations.
- Describe how current educational approaches inform school facility design, including sustainable design approaches. net-zero energy strategies, and the use of modular or prefabricated classrooms.
- List the various technologies, materials, and systems that create a learning tool out of building features and energymanagement systems. to design high-performance schools that emphasize student health and enhance classroom performance.
- Compare various design solutions and architectural features intended to encourage student interaction, physical activity and health, business community involvement, and the use of new technology in the classroom.
Take this free BDCuniversity course
Related Stories
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.
| Dec 9, 2011
BEST AEC FIRM 2011: Chapman Construction/Design
Taking sustainable practices to heart.
| Dec 9, 2011
BEST AEC FIRMS 2011: EYP Architecture & Engineering
Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.