flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

K-12 school design that pays off for students

K-12 school design that pays off for students

This free BDCuniversity course is worth 1.0 AIA LU/HSW


By C.C. Sullivan and Barbara Horwitz-Bennett, Contributing Editors | September 4, 2013

More and more educators are being influenced by the Reggio Emilia approach to pedagogy, with its mantra of “environment as the third teacher”—an approach that gives Building Teams a responsibility to pay even closer attention to the special needs of today’s schools. 

In addition to helping support the pedagogical aims of those owner institutions, Building Teams are also crafting new approaches to creating sustainable, high-performance K-12 schools. As school districts struggle to find the capital to build and maintain energy-efficient, healthy environments, K-12 project teams are developing strategies to help support high-performance educational facilities and stay on budget. 

This approach begins with Building Teams taking an integrated approach where the architect, engineer, contractor, and building owner collaborate early on in the project and take a holistic approach to the design.

After reading this article, you should be able to:

  • Discuss integrated design strategies that help make K-12 facilities more energy efficient and sustainable while reducing the cost of operations.
  • Describe how current educational approaches inform school facility design, including sustainable design approaches. net-zero energy strategies, and the use of modular or prefabricated classrooms.
  • List the various technologies, materials, and systems that create a learning tool out of building features and energymanagement systems. to design high-performance schools that emphasize student health and enhance classroom performance.
  • Compare various design solutions and architectural features intended to encourage student interaction, physical activity and health, business community involvement, and the use of new technology in the classroom.

 

Take this free BDCuniversity course

        

Related Stories

| Aug 21, 2012

Hong Kong’s first LEED Platinum pre-certified building opens

Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.

| Aug 21, 2012

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.

| Aug 20, 2012

Protecting the artifacts at George H.W. Bush Presidential Library and Museum

Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.

| Aug 17, 2012

Ferreri joins PGAL as Principal

Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.

| Aug 17, 2012

Centric Architecture and PLAD Studio merge

The new firm will retain Centric Architecture as its name.

| Aug 15, 2012

MBH Architects announces new appointments

MBH Architects continues to grow, take on new clients.

| Aug 15, 2012

Architects and designers challenged in Allsteel’s reality design competition

KITS mobile app offers flexibility in planning.

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

| Aug 14, 2012

SOM Foundation announces prize recipients for 2012

Submissions for the SOM Prize were received from students at 34 schools in the U.S.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021