The JW Marriott Indianapolis redefined the city’s skyline. With more than 1,000 rooms, the 34-story JW Marriott is both the largest and tallest hotel in Indianapolis. One of the most prestigious hotels in the city, the JW Marriott has hosted celebrities and NFL teams alike.
For the complicated construction of this new hotel, JW Marriott chose to install Viega ProPress systems for domestic water and hot water heating applications on all copper piping systems sizes 2" and down.
Circle Design engineering group worked on the design portion of the building. Alexander Veksler, currently with AVEKS Engineering, Inc. in Indianapolis, engineered the JW Marriott project.
“I was very pleased,” Veksler said. “Overall, the system gives the opportunity to do a lot of things in a faster, more reliable way. You save money and labor. You save on welding. In some places where welding is not desirable, pressing really has the presence. That’s what we like about it.”
Veksler was originally introduced to Viega products through a local sales representative seven years ago. He indicated that the system held together well, even during testing that incorporated several tests at high pressures.
Viega ProPress systems, the original copper press fitting, available in sizes ½" to 4"
The complexity of the plumbing design and the timeframe for the project both presented challenges to the contractor, North Mechanical Contracting but Viega ProPress offered the benefits needed to overcome those challenges.
With nearly 400 different fitting configurations ranging from ½" to 4", Viega ProPress copper fittings can be designed into nearly any project. As the first manufacturer to offer press fitting systems, Viega has a tried and tested history of excellence around the world. Viega ProPress has been revolutionizing the way America joins pipe since 1999. And with more approved applications than any other press fitting system in the industry, whether heating, potable water, natural gas, propane, fire protection or solar, Viega ProPress is the smartest choice for any commercial, institutional or industrial project.
Only Viega offers the patented Viega Smart Connect feature. The Viega Smart Connect feature is the only guaranteed method in the industry to identify unpressed connections, which means you can trust that an installation is secure. The versatile alternative to conventional pipe joining methods, reliable Viega ProPress is backed by an industry-leading warranty.
Veksler knows of other future projects where Viega ProPress has been included in the specs.
With the reliability of flameless Viega ProPress, projects stay on schedule. Secure, consistent connections keep installations moving and provide genuine peace of mind.
“It’s a reliable product,” Veksler said. “We like the development of the product through the years. We like that Viega is coming out with new products. We are looking forward to using it in the future.”
Viega
1.800.976.9819
insidesales@viega.us
www.viega.us
Related Stories
| Feb 24, 2014
First look: UC San Diego opens net-zero biological research lab
The facility is intended to be "the most sustainable laboratory in the world," and incorporates natural ventilation, passive cooling, high-efficiency plumbing, and sustainably harvested wood.
| Feb 24, 2014
White Paper: The science of color and light
This white paper from Benjamin Moore provides an overview of the properties of color and light, along with practical guidance on how the relationship between the two affects design choices.
| Feb 21, 2014
Naturally ventilated hospital planned in Singapore
The Ng Teng Fong General Hospital will take advantage of the region's prevailing breezes to cool the spaces.
| Feb 21, 2014
Calatrava ordered to pay millions for 'shortcomings in his work' on conference center project
Famed architect Santiago Calatrava must pay 2.9 million euros due to faulty design work on the Palacio de Congresos project in Oviedo, Spain.
| Feb 21, 2014
First look: Goettsch Partners reveals 'lighthouse' tower scheme for China resort
Topped with glowing beacon that will be visible for miles in any direction, the Rosewood Sanya tower is the centerpiece of a new resort and meeting complex on China’s Hainan Island.
| Feb 20, 2014
5 myths about cross laminated timber
A CLT expert clears up several common misconceptions and myths surrounding the use of wood as a building material.
Sponsored | | Feb 20, 2014
Chicago’s historic Wrigley Building renovated to attract tech companies
Purchased in 2011 by a consortium of investors led by BDT Capital Partners, the building’s new owners have recently renovated and reimagined the next life for this architectural landmark—as a hub for tech firms.
| Feb 20, 2014
World's longest desk? Massive, undulating desk accommodates 145 office workers [video]
The desk is built from plywood and one continuous sheet of resin, and can serve all 145 office employees at once.
| Feb 19, 2014
It's a world record! Largest uninterrupted concrete pour kicks off Wilshire Grand project
Guinness World Records verifies the concrete pour as the largest ever
| Feb 19, 2014
Why you should start with a builder, part two
When it’s time to build or expand, the first step is finding a builder that fits your needs. Once you have found a builder, checked their references, visited with their previous clients and are ready to move forward, the next step is answering an initial set of questions that will direct your project.