flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

JW Marriott Indianapolis redefines city’s skyline

Sponsored Content

JW Marriott Indianapolis redefines city’s skyline

The 34-story JW Marriott is both the largest and tallest hotel in Indianapolis.


By Viega | June 22, 2014
JW Marriott Indianapolis
JW Marriott Indianapolis

The JW Marriott Indianapolis redefined the city’s skyline. With more than 1,000 rooms, the 34-story JW Marriott is both the largest and tallest hotel in Indianapolis. One of the most prestigious hotels in the city, the JW Marriott has hosted celebrities and NFL teams alike. 

For the complicated construction of this new hotel, JW Marriott chose to install Viega ProPress systems for domestic water and hot water heating applications on all copper piping systems sizes 2" and down.

Circle Design engineering group worked on the design portion of the building. Alexander Veksler, currently with AVEKS Engineering, Inc. in Indianapolis, engineered the JW Marriott project.

“I was very pleased,” Veksler said. “Overall, the system gives the opportunity to do a lot of things in a faster, more reliable way. You save money and labor. You save on welding. In some places where welding is not desirable, pressing really has the presence. That’s what we like about it.”

Veksler was originally introduced to Viega products through a local sales representative seven years ago. He indicated that the system held together well, even during testing that incorporated several tests at high pressures. 

 


Viega ProPress systems, the original copper press fitting, available in sizes ½" to 4"

 

The complexity of the plumbing design and the timeframe for the project both presented challenges to the contractor, North Mechanical Contracting but Viega ProPress offered the benefits needed to overcome those challenges. 

With nearly 400 different fitting configurations ranging from ½" to 4", Viega ProPress copper fittings can be designed into nearly any project. As the first manufacturer to offer press fitting systems, Viega has a tried and tested history of excellence around the world. Viega ProPress has been revolutionizing the way America joins pipe since 1999. And with more approved applications than any other press fitting system in the industry, whether heating, potable water, natural gas, propane, fire protection or solar, Viega ProPress is the smartest choice for any commercial, institutional or industrial project. 

Only Viega offers the patented Viega Smart Connect feature. The Viega Smart Connect feature is the only guaranteed method in the industry to identify unpressed connections, which means you can trust that an installation is secure. The versatile alternative to conventional pipe joining methods, reliable Viega ProPress is backed by an industry-leading warranty.  

Veksler knows of other future projects where Viega ProPress has been included in the specs.

With the reliability of flameless Viega ProPress, projects stay on schedule. Secure, consistent connections keep installations moving and provide genuine peace of mind. 

“It’s a reliable product,” Veksler said. “We like the development of the product through the years. We like that Viega is coming out with new products. We are looking forward to using it in the future.”

Viega
1.800.976.9819
insidesales@viega.us
www.viega.us

Related Stories

| Jun 9, 2014

Eli Broad museum files $19.8 million lawsuit over delays

The museum, meant to hold Eli and Edythe Borad's collection of contemporary art, is suing the German company Seele for what the museum describes as delays in the creation of building blocks for its façade.

| Jun 8, 2014

What’s the word of the day? It’s all about ‘resiliency’

Just for the sake of argument, let’s put aside the rhetoric about climate change—whether it’s actually happening, whether it’s a result of manmade activity—and agree that we are experiencing some pretty dramatic weather events that are having huge impacts on populations here in the U.S. and worldwide.

Smart Buildings | Jun 8, 2014

Big Data: How one city took control of its facility assets with data

Over the past few years, Buffalo has developed a cutting-edge facility management program to ensure it's utilizing its facilities and operations as efficiently, effectively, and sustainably as possible. 

| Jun 6, 2014

Must see: Can a floating city offset urban population growth in China?

AT Design Office has proposed a design for a floating city to offset increasing urban populations in China. To create the new city, a 10-square kilometer island would be made out of prefab blocks. 

| Jun 6, 2014

KPF, Kevin Roche unveil design for 51-story Hudson Yards tower in NYC [slideshow]

Related Companies and Oxford Properties Group are teaming to develop Fifty Five Hudson Yards, the latest addition to the commercial office tower collection in the 28-acre Hudson Yards development—the largest private real estate development in the history of the U.S.

| Jun 6, 2014

Shipping container ship terminal completed in Spain

In Seville, Spain, architectural firms Hombre de Piedra and Buró4 have designed and completed a cruise ship terminal out of used shipping containers.

| Jun 5, 2014

International Parking Institute names best new parking structures

Winners include garages that are architectural delights, an airport's canopied parking atrium, and an environmentally friendly garage under America's oldest park.

| Jun 4, 2014

Emerging trends in healthcare development: neighborhood care, mixed-use models on the rise

In urban and even suburban markets, real estate is about the "live, work, play," with close proximity to mass transit and other amenities, like retail stores. Healthcare organizations are following suit.

| Jun 4, 2014

Want to design a Guggenheim? Foundation launches open competition for proposed Helsinki museum

This is the first time the Guggenheim Foundation has sought a design through an open competition. Anonymous submissions for stage one of the competition are due September 10, 2014.

| Jun 4, 2014

Market update: A difficult first quarter for construction spending comes to an end

This year's unusually difficult winter took its toll on construction activity. Nonetheless, first quarter spending for all the major groups was up compared to the same period in 2013.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021