The JW Marriott Indianapolis redefined the city’s skyline. With more than 1,000 rooms, the 34-story JW Marriott is both the largest and tallest hotel in Indianapolis. One of the most prestigious hotels in the city, the JW Marriott has hosted celebrities and NFL teams alike.
For the complicated construction of this new hotel, JW Marriott chose to install Viega ProPress systems for domestic water and hot water heating applications on all copper piping systems sizes 2" and down.
Circle Design engineering group worked on the design portion of the building. Alexander Veksler, currently with AVEKS Engineering, Inc. in Indianapolis, engineered the JW Marriott project.
“I was very pleased,” Veksler said. “Overall, the system gives the opportunity to do a lot of things in a faster, more reliable way. You save money and labor. You save on welding. In some places where welding is not desirable, pressing really has the presence. That’s what we like about it.”
Veksler was originally introduced to Viega products through a local sales representative seven years ago. He indicated that the system held together well, even during testing that incorporated several tests at high pressures.
Viega ProPress systems, the original copper press fitting, available in sizes ½" to 4"
The complexity of the plumbing design and the timeframe for the project both presented challenges to the contractor, North Mechanical Contracting but Viega ProPress offered the benefits needed to overcome those challenges.
With nearly 400 different fitting configurations ranging from ½" to 4", Viega ProPress copper fittings can be designed into nearly any project. As the first manufacturer to offer press fitting systems, Viega has a tried and tested history of excellence around the world. Viega ProPress has been revolutionizing the way America joins pipe since 1999. And with more approved applications than any other press fitting system in the industry, whether heating, potable water, natural gas, propane, fire protection or solar, Viega ProPress is the smartest choice for any commercial, institutional or industrial project.
Only Viega offers the patented Viega Smart Connect feature. The Viega Smart Connect feature is the only guaranteed method in the industry to identify unpressed connections, which means you can trust that an installation is secure. The versatile alternative to conventional pipe joining methods, reliable Viega ProPress is backed by an industry-leading warranty.
Veksler knows of other future projects where Viega ProPress has been included in the specs.
With the reliability of flameless Viega ProPress, projects stay on schedule. Secure, consistent connections keep installations moving and provide genuine peace of mind.
“It’s a reliable product,” Veksler said. “We like the development of the product through the years. We like that Viega is coming out with new products. We are looking forward to using it in the future.”
Viega
1.800.976.9819
insidesales@viega.us
www.viega.us
Related Stories
Giants 400 | Aug 4, 2015
GIANTS 300 REPORT: Top 64 Architecture/Engineering Firms
Stantec, HOK, and Callison RTKL top Building Design+Construction's 2015 ranking of the largest architecture/engineering firms in the United States.
Giants 400 | Aug 4, 2015
GIANTS 300 REPORT: Top 106 Architecture Firms
Gensler, Perkins+Will, and Kohn Pedersen Fox top Building Design+Construction's 2015 ranking of the largest architecture firms in the United States.
Giants 400 | Aug 4, 2015
ARCHITECTURE GIANTS: 21 practice management innovations from architecture Giants
Design firms have gone all out with management innovations in the last year. Check out which ones might work for your firm.
Architects | Aug 4, 2015
Frank Lloyd Wright School of Architecture closer to independent incorporation
The school is halfway to its first fundraising milestone, but is facing a major deadline at end of this month.
Industrial Facilities | Aug 3, 2015
Architect Jacques Rougerie envisions floating city to function as roving laboratory
The manta ray-shaped vessel will be completely self-sustaining, run on marine energy, and produce no waste.
Cultural Facilities | Aug 3, 2015
Funding needed for Washington's Desert Storm memorial
The National Desert Storm Memorial Foundation has a $25 million goal for the project.
Sports and Recreational Facilities | Jul 31, 2015
Zaha Hadid responds to Tokyo Olympic Stadium controversy
“Our warning was not heeded that selecting contractors too early in a heated construction market and without sufficient competition would lead to an overly high estimate of the cost of construction,” said Zaha Hadid in a statement.
Architects | Jul 30, 2015
The Lego Architect: Book offers simple how-to steps for recreating iconic buildings with Legos
The book features famous buildings accompanied with a photograph and drawing of the Lego model of the building, and a list of all the Lego pieces needed to complete a model of the building.
Transit Facilities | Jul 30, 2015
Snøhetta designs ring-shaped cable car station in Italian Alps
In Snøhetta’s design, two cylindrical rings embedded into the existing topography, each at different elevations, will be connected by a cable car. During the minute-long cable car journey, passengers can enjoy views of the city and of the Italian Alps.
Office Buildings | Jul 29, 2015
Design plans for Fannie Mae’s new HQ revealed
The developer/owner, Carr Properties, envisions a 1-million-sf plus mixed-use center with a large retail pavilion.