flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Jones Lang LaSalle completes construction of two new stores in Manhattan

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.


By By BD+C Staff | November 22, 2011
Jones Lang LaSalle Uniglo Manhattan 5th avenue
Jones Lang LaSalles Project and Development Services group was tapped by Uniqlo to serve as project manager for the constructio

Jones Lang LaSalle has completed construction on two new high-end stores, totaling 153,000 square feet, for Uniqlo Co. Ltd. in Manhattan. The locations include the Japanese clothing retailer’s New York global flagship at 666 Fifth Avenue and another store at 31 West 34th Street. The Uniqlo Fifth Avenue store and the Uniqlo 34th Street site will be the second and third locations in the U.S. following the opening of Uniqlo on Broadway in Manhattan’s Soho neighborhood in 2006.

Jones Lang LaSalle’s Project and Development Services group was tapped by Uniqlo to serve as project manager for the construction of the two new Manhattan locations. The company’s responsibilities included project planning; design management; furniture, fixtures and equipment coordination; procurement management; and budget and schedule management. The PDS team also communicated regularly with the Tokyo-based owner and design team to explain all required consultant services and to closely manage project costs and schedules. BD+C

Related Stories

| Aug 19, 2011

Underfloor air distribution, how to get the details right

Our experts provide solid advice on the correct way to design and construct underfloor air distribution systems, to yield significant energy savings.

| Aug 19, 2011

Enhanced acoustical design

Ambient noise levels in some facility types are trending up and becoming a barrier to clear communication between building occupants.

| Jul 22, 2011

The Right Platform for IPD

Workstations for successful integrated project delivery, a white paper by Dell and BD+C.

| Jul 22, 2011

High-performance windows and doors

Learning objectives After reading this article, you should be able to: Understand issues of thermal performance and energy efficiency in relation to window and door systems; describe optimal detailing of the window-wall interface and how it contributes to building performance, sustainability, and occupant well-being; understand how durability contributes to sustainable windows/doors; and list sustainable O&M requirements for window and door systems.

| Jul 21, 2011

Falling Architecture Billings Index reflects decrease in design demands

This months Architecture Billings Index (ABI), provided by the American Institute of Architects, is almost a full point lower than last month’s reported score. June’s reading of 47.2 was short of the required 50 to achieve billings increases, making July’s reading of 46.3 an unwelcome sign of market tidings.

| Jun 29, 2011

New leadership role for architects in net-zero design

BD+C Editorial Director Rob Cassidy talks with RNL Design's Tom Hootman, AIA, about the changing role of architects in net-zero designs.

boombox1
boombox2
native1

More In Category


Retail Centers

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021