flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Joliet Junior College achieves LEED Gold

Joliet Junior College achieves LEED Gold

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.


By By BD+C Staff | March 6, 2012
JJCs Facility Services Building is part of a $220 million master plan aimed at
JJCs Facility Services Building is part of a $220 million master plan aimed at transforming the colleges approach to sustainab

The U.S. Green Building Council awarded the Joliet Junior College (JJC) Facility Services Building a LEED New Construction 2009 Gold certification – making the  Facility Services Building the first of its kind on a higher education campus to receive this level of certification.

Designed by Legat Architects and built by Gilbane, the Facility Services Building’s new mechanical and electrical systems resulted in a 42% reduction in energy use and an annual savings of approximately 37% in operating costs.

Gilbane oversaw the procurement, installation and commissioning of all the LEED systems, working with contractors to ensure that they used LEED-compliant materials and submitting the documentation for all of the LEED construction-related points. The team also worked with JJC to lead a significant construction waste recycling effort.

Sustainable elements of the building include:

  • Geothermal HVAC system to reduce heating and cooling loads
  • Reflective roof surface to reduce heat gain
  • Solar heat collectors tied to outside air intake to minimize the amount of energy used to heat the inside of the building
  • Use of LED lighting in all areas of the building
  • Motion sensors for lighting in occupied spaces
  • Operable, high-efficiency windows to improve ventilation and bring in fresh air
  • More than 75% of construction waste diverted from landfills
  • Use of recycled and locally sourced materials during construction
  • Low-VOC paints, adhesives, and sealants used in all spaces of the building

JJC’s Facility Services Building is part of a $220 million master plan aimed at transforming the college’s approach to sustainability and efficiency. The 42,500-square-foot facility replaces several scattered temporary buildings that previously housed the custodial, maintenance, planning/construction and roads/grounds staff at JJC. BD+C

Related Stories

| Sep 19, 2012

HGA Architects & Engineers moves offices in San Francisco

HGA’s San Francisco office has grown by nearly 25% in the past two years, adding shared expertise to the 120-person California practice, which includes the Sacramento and Los Angeles offices.

| Sep 19, 2012

Sasaki opens office in Shanghai

Office supports firm’s present and future work in China, throughout Asia.

| Sep 18, 2012

MBMA partners with ORNL for whole building energy efficiency study

The results are intended to advance energy efficiency solutions for new and retrofit applications.

| Sep 18, 2012

MKK opens office in North Dakota

MKK is currently working on seven projects in North Dakota, including a hotel, restaurant, truck stop, office building, and apartment complex.

| Sep 18, 2012

Firestone Building Products launches new website

Deep product information and innovative customer support tools are highlights.

| Sep 13, 2012

Leo A Daly Company promotes Kraskiewicz to senior vice president

Kraskiewicz, who most recently served as chief operations officer for the Leo A Daly division, will guide brand management, business development, operations and financial performance for 18 offices worldwide.

| Sep 13, 2012

Acentech adds audiovisual expertise to Trevose, Penn. office

Artese focuses on advising, overseeing, and maintaining the client’s vision for the project from the initial kick-off meeting to the final commissioning of the completed systems.

| Sep 13, 2012

Margulies Perruzzi Architects completes office design for Pioneer Investments

MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street.

| Sep 12, 2012

Harvesting new ways to eliminate waste at the USDA

After installing 20 high-speed, energy-efficient hand dryers in restrooms throughout the USDA headquarters; the USDA reports seeing an immediate 50% reduction in the use of paper towels.

| Sep 11, 2012

RTKL appoints Lance Hosey as Chief Sustainability Officer and Senior Vice President

Author and authority on green design to spearhead RTKL Performance-driven DesignSM initiative.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021