Hill International, a global leader in managing construction risk, has announced that its joint venture with URS Corp. has received a blanket purchase agreement from the U.S. General Services Administration to provide construction management as agent services for the U.S. Department of State's Foreign Affairs Security Training Center (FASTC) project. The five-year agreement has an estimated value to the URS/Hill joint venture of approximately $21.8 million. URS is a 60% partner in the joint venture, and Hill is a 40% partner.
The FASTC project will establish a consolidated training center for training in a wide array of law enforcement and security disciplines within the U.S. Department of State for the protection of diplomats and U.S. embassies abroad. Diplomatic security training is currently conducted at up to 19 different, geographically separated, leased and contracted facilities nationwide. The new FASTC will be a state-of-the-art facility. It is expected to provide training for 8,000-10,000 students per year, including special agents, foreign service officers, selected foreign law enforcement and other personnel.
The URS/Hill joint venture will provide construction management services during the design, construction, and commissioning phases of the FASTC project.
"Hill is proud to be partnered with URS to manage construction of a facility that will help enhance the training of law enforcement officials and ultimately improve diplomat and embassy security," said James E. Koch, Ph.D., P.E., LEED AP, F.SAME, Senior Vice President and Director of Hill's Federal Services Group. +
Related Stories
| Nov 9, 2011
American Standard Brands joins the Hospitality Sustainable Purchasing Consortium
American Standard will collaborate with other organizations to build an industry-wide sustainability performance index.
| Nov 8, 2011
Transforming a landmark coastal resort
Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.
| Nov 8, 2011
WEB EXCLUSIVE: Moisture-related failures in agglomerated floor tiles
Agglomerated tiles offer an appealing appearance similar to natural stone at a lower cost. To achieve successful installations, manufacturers should provide design data for moisture-related dimensional changes, specifiers should require in-situ moisture testing similar to those used for other flooring materials, and the industry should develop standards for fabrication and installation of agglomerated tiles.
| Nov 8, 2011
$11 million business incubator Florida Innovation Hub at the University of Florida completed by Charles Perry Partners, Inc.
The facility houses the UF Office of Technology Licensing, UF Tech Connect, other entities, and more than 30 startup technology tenants.
| Nov 8, 2011
Designer joins Holabird & Root
Clifton has been awarded numerous awards throughout her career, including two AIA Chicago Design Excellence Awards.
| Nov 4, 2011
Mortenson Construction builds its fifth wind facility In Illinois
Shady Oaks Wind Farm is under construction near Compton, Ill.
| Nov 4, 2011
McCarthy completes construction of South Region High School No. 2 in Los Angeles
Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.
| Nov 4, 2011
Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards
Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.
| Nov 3, 2011
GREC Architects announces opening of the Westin Abu Dhabi Golf Resort and Spa
The hotel was designed by GREC and an international team of consultants to enhance the offerings of the Abu Dhabi Golf Club without imposing upon the dramatic landscapes of the elite golf course.
| Nov 3, 2011
Hardin Construction tops out Orlando Embassy Suites
The project began in April 2011 and is expected to open in fall 2012.