flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Joint venture to manage construction of U.S. State Department's Foreign Affairs Security Training Center

Joint venture to manage construction of U.S. State Department's Foreign Affairs Security Training Center

The project will establish a center for training in a variety of security disciplines within the U.S. Department of State for the protection of diplomats and U.S. embassies abroad.


By Posted by Raissa Rocha, Associate Editor | October 12, 2012

Hill International, a global leader in managing construction risk, has announced that its joint venture with URS Corp. has received a blanket purchase agreement from the U.S. General Services Administration to provide construction management as agent services for the U.S. Department of State's Foreign Affairs Security Training Center (FASTC) project. The five-year agreement has an estimated value to the URS/Hill joint venture of approximately $21.8 million. URS is a 60% partner in the joint venture, and Hill is a 40% partner.

The FASTC project will establish a consolidated training center for training in a wide array of law enforcement and security disciplines within the U.S. Department of State for the protection of diplomats and U.S. embassies abroad. Diplomatic security training is currently conducted at up to 19 different, geographically separated, leased and contracted facilities nationwide. The new FASTC will be a state-of-the-art facility. It is expected to provide training for 8,000-10,000 students per year, including special agents, foreign service officers, selected foreign law enforcement and other personnel.

The URS/Hill joint venture will provide construction management services during the design, construction, and commissioning phases of the FASTC project.

"Hill is proud to be partnered with URS to manage construction of a facility that will help enhance the training of law enforcement officials and ultimately improve diplomat and embassy security," said James E. Koch, Ph.D., P.E., LEED AP, F.SAME, Senior Vice President and Director of Hill's Federal Services Group. +

Related Stories

| Apr 25, 2012

Rogers joins Morgan/Harbour as senior project manager

Rogers will also manage the construction process and daily activities as well as act as the interface between the subcontractors, owners, municipalities and regulatory agencies

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 24, 2012

Roofing Supply Group acquired by Clayton, Dubilier & Rice

RSG provides a complete offering of residential and commercial roofing materials and related supplies.

| Apr 24, 2012

McLennan named Ashoka Fellow

McLennan was recognized for his work on the Living Building Challenge.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

| Apr 23, 2012

Vegas’ CityCenter called financial ‘black hole’

Two and a half years ago, stockholders filed six lawsuits after the stock price fell from $99.75 on Oct. 9, 2007, to $1.89 on March 5, 2009. Bondholders sued over similar steep losses.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

| Apr 23, 2012

AAMA releases updated specification for anodized aluminum

AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.

| Apr 23, 2012

Thornton Tomasetti project wins AISC Merit Award

Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021