Architect Jean Nouvel unveiled the official design for the new National Art Museum of China (NAMOC) during a press conference in Beijing last week, Archdaily reports.
Of the design, Nouvel describes it as inspired by the simplicity of “a single brush stroke.”
The museum’s new site will have seven times more space than the current one in the Dongcheng District, near the Forbidden City. The site will be in the Olympic Village, further away from the Forbidden City but within ancient Beijing’s historical access.
According to Archinect, the new NAMOC will be 1.4 million sf and will house various collections of 100,000 pieces from the 1500s to contemporary times. The museum’s primary exhibition will be calligraphy and 21st century Chinese art. The museum will include temporary and permanent exhibition galleries, a research and education center, reserves an auditorium, and public and administrative spaces.
Other star architects who submitted designs back in 2012 for the competition include Rem Koolhaas, Zaha Hadid, and Frank Gehry.
Related Stories
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.