flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Jean Nouvel loses court battle against Philharmonie de Paris over alleged design ‘sabotage’

Cultural Facilities

Jean Nouvel loses court battle against Philharmonie de Paris over alleged design ‘sabotage’

Nouvel boycotted the January opening of the facility and asked for his name to be removed from all references to the work. 


By BD+C Staff | April 20, 2015
Jean Nouvel loses court battle against Philharmonie de Paris over alleged design ‘sabotage’

Nouvel accused project managers of cutting corners to save money during the hall’s completion. Photo: Copyleft via Wikimedia Commons

French architect Jean Nouvel lost a court battle on Thursday against developers of the $418 million Philharmonie de Paris concert hall in the French capital’s Parc de La Vilette, The Telegraph reports.

Documents from the French court show that Nouvel accused project managers of cutting corners to save money during the hall’s completion. Nouvel boycotted the January opening of the Philharmonie de Paris and asked for his name to be removed from all references to the work. 

Nouvel said changes were required on the hall’s parapets, foyers, façades, the promenade, and acoustic elements. But the courts said that Nouvel was not able to provide sufficient evidence and documentation to prove this.

The “premature” completion resulted in a display of “contempt for architecture, for the profession and for the architect of the most important French cultural program of the new century,” The Telegraph reports Nouvel saying.

The Telegraph has the full story.

Related Stories

Cultural Facilities | Nov 19, 2021

Goettsch Partners completes Lincoln Park Zoo’s Pepper Family Wildlife Center

The project doubles the size of the previous lion habitat.

Cultural Facilities | Nov 17, 2021

Henning Larsen-designed Shaw Auditorium opens at the Hong Kong University of Science and Technology

The project celebrated its grand opening as part of HKUST’s thirtieth anniversary celebration.

Cultural Facilities | Oct 19, 2021

Niagara Falls is getting a bigger Welcome Center

The GWWO Architects-designed building will mostly sit on the site of the center it replaces.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Cultural Facilities | Aug 2, 2021

A new venue for the San Diego Symphony’s outdoor performances opens this week

Rady Shell at Jacobs Park was funded almost entirely by private donors.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Multifamily Housing | Jun 3, 2021

Student Housing Trends 2021-2022

In this exclusive video interview for HorizonTV, Fred Pierce, CEO of Pierce Education Properties, developer and manager of off-campus student residences, chats with Rob Cassidy, Editor, MULTIFAMILY Design + Construction about student housing during the pandemic and what to expect for on-campus and off-campus housing in Fall 2021 and into 2022.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021