Soho Properties’ CEO Sharif El-Gamal commissioned French architect Jean Nouvel to design the Islam Museum on a site the company purchased on 49-51 Park Place for $10.7 million, Archinect reports.
According to Curbed New York, industry professionals had previously expressed doubt that El-Gamal would find it easy to find people to collaborate with, especially that a “certain faction of people remains vocally opposed to the idea of a Muslim anything being built in Lower Manhattan.”
Nouvel, a Pritzker Prize-winning architect educated at Paris’ École nationale supérieure des Beaux-Arts, has had extensive experience designing using cues from Islamic World art, such as the critically acclaimed Arab World Institute in Paris and the Louvre Abu Dhabi.
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.