flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

JEA Headquarters tops out in Jacksonville

Office Buildings

JEA Headquarters tops out in Jacksonville

The building has recently topped out.


By David Malone, Associate Editor | March 24, 2021

Courtesy JEA

JEA, a not-for-profit, community-owned utility, and Ryan Companies have recently topped out the new JEA Headquarters in Downtown Jacksonville.

The seven-story, 153,000-sf build-to-suit project includes aspects of the surrounding area’s bridges and rich industrial history while providing access to Jacksonville’s major roadways and public transportation. The Class A office tower includes a seven-story, 630 space parking garage and street-level retail.

The new space will provide the utility with updated facilities to serve its customers and the community. The building is designed to achieve LEED Gold certification and WELL Building standards. Completion is slated for 2022.

Related Stories

| Feb 20, 2013

CoreNet Global to real estate execs: 'Move forward on net-zero'

CoreNet Global, a major international association for corporate real estate and workplace executives, has released a public policy statement advocating adoption of net-zero energy buildings.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Feb 14, 2013

Boxman Studios launches shipping container buildings division

Boxman Studios has launched a new division aimed at sustainable solutions for the Built Environment. The Boxman Studios Buildings Division will focus on the adaptive use of decommissioned shipping containers as architectural elements and even complete buildings.

| Feb 14, 2013

Guardian DiamondGuard installed in the Empire State Building

Guardian Industries DiamondGuard glass was recently installed on the 102nd story of the Empire State Building in New York City as part of an extensive renovation to update this venerable landmark.

| Feb 12, 2013

OMA's 'perimeter core' design wins competition for Essence Financial Building in Shenzhen

OMA partners David Gianotten and Rem Koolhaas rethink traditional office tower design with a plan that shifts the building's core to the edge for large, unobstructed plans.

| Feb 8, 2013

5 factors to consider when designing a shade system

Designing a shade system is more complex than picking out basic white venetian blinds. Here are five elements to consider when designing an interior shade system.

| Feb 6, 2013

RSMeans cost comparisons: office buildings and medical offices

RSMeans' February 2013 Cost Comparison Report breaks down the average construction costs per square foot for four types of office buildings across 25 metro markets.

| Feb 1, 2013

Delinquency rate for U.S. commercial real estate loans hits 11-month low

The delinquency rate for U.S. commercial real estate loans in CMBS fell 14 basis points in January to 9.57%. This is the lowest level in 11 months, according to Trepp, LLC's latest U.S. CMBS Delinquency Report.

| Jan 31, 2013

The Opus Group completes construction of corporate HQ for Church & Dwight Co.

The Opus Group announced today the completion of construction on a new 250,000-square-foot corporate headquarter campus for Church & Dwight Co., Inc., in Ewing Township, near Princeton, N.J.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021