flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

JCJ Architecture designs New York City's first casino

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.


By By BD+C Staff | April 4, 2012
The complex, located within the Aqueduct Racetrack complex, will contribute appr
The complex, located within the Aqueduct Racetrack complex, will contribute approximately $350 million annually to the State of

JCJ Architecture completed the first phase of the 1,086,000-sf Resorts World Casino New York City in Queens, N.Y., the largest entertainment center in New York City's metro area and the city's only casino. Developed and operated by Malaysian-based Genting Group, the project is the first company-owned U.S. venture for the leading global leisure and hospitality corporation.

The complex, located within the Aqueduct Racetrack complex, will contribute approximately $350 million annually to the State of New York to support education while offering locals and tourists alike world-class gaming, dining and entertainment options.

Adding 1,200 new construction jobs with a total construction cost of $510 million, the three-level complex required extensive site redevelopment and improvements on 64 acres, renovation of existing facilities, and new construction totaling approximately 736,000-sf.

JCJ Architecture served as architect and interior design firm for the project. The project team included professionals from across JCJ's network of offices, led by senior executives from JCJ including Bill Dow, Brian Davis, Scott Celella, Alexandra Lopatynsky, Jeff Wynkoop and Peter Fabian.  Tutor Perini served as construction manager. BD+C

Related Stories

| Feb 15, 2011

Iconic TWA terminal may reopen as a boutique hotel

The Port Authority of New York and New Jersey hopes to squeeze a hotel with about 150 rooms in the space between the old TWA terminal and the new JetBlue building. The old TWA terminal would serve as an entry to the hotel and hotel lobby, which would also contain restaurants and shops.

| Feb 15, 2011

New Orleans' rebuilt public housing architecture gets mixed reviews

The architecture of New Orleans’ new public housing is awash with optimism about how urban-design will improve residents' lives—but the changes are based on the idealism of an earlier era that’s being erased and revised.

| Feb 15, 2011

LAUSD commissions innovative prefab prototypes for future building

The LA Unified School District, under the leadership of a new facilities director, reversed course regarding prototypes for its new schools and engaged architects to create compelling kit-of-parts schemes that are largely prefabricated.

| Feb 15, 2011

New 2030 Challenge to include carbon footprint of building materials and products

Architecture 2030 has just broadened the scope of its 2030 Challenge, issuing an additional challenge regarding the climate impact of building products. The 2030 Challenge for Products aims to reduce the embodied carbon (meaning the carbon emissions equivalent) of building products 50% by 2030.

| Feb 15, 2011

New Urbanist Andrés Duany: We need a LEED Brown rating

Andrés Duany advocates a "LEED Brown" rating that would give contractors credit for using traditional but low cost measures that are not easy to quantify or certify. He described these steps as "the original green," and "what we did when we didn't have money." Ostensibly, LEED Brown would be in addition to the current Silver, Gold and Platinum ratings.

| Feb 15, 2011

AIA on President Obama's proposed $1 billion investment in energy conservation

The President’s budget increases the value of investment in energy conservation in commercial buildings by roughly $1 billion, reports AIA 2011 President Clark Manus, FAIA. The significant increase from the current tax deduction of $1.80 per sq. ft. now on the books is an increase for which the AIA has been advocating in order to encourage energy conservation.

| Feb 14, 2011

Sustainable Roofing: A Whole-Building Approach

According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021