flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

JCJ Architecture designs New York City's first casino

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.


By By BD+C Staff | April 4, 2012
The complex, located within the Aqueduct Racetrack complex, will contribute appr
The complex, located within the Aqueduct Racetrack complex, will contribute approximately $350 million annually to the State of

JCJ Architecture completed the first phase of the 1,086,000-sf Resorts World Casino New York City in Queens, N.Y., the largest entertainment center in New York City's metro area and the city's only casino. Developed and operated by Malaysian-based Genting Group, the project is the first company-owned U.S. venture for the leading global leisure and hospitality corporation.

The complex, located within the Aqueduct Racetrack complex, will contribute approximately $350 million annually to the State of New York to support education while offering locals and tourists alike world-class gaming, dining and entertainment options.

Adding 1,200 new construction jobs with a total construction cost of $510 million, the three-level complex required extensive site redevelopment and improvements on 64 acres, renovation of existing facilities, and new construction totaling approximately 736,000-sf.

JCJ Architecture served as architect and interior design firm for the project. The project team included professionals from across JCJ's network of offices, led by senior executives from JCJ including Bill Dow, Brian Davis, Scott Celella, Alexandra Lopatynsky, Jeff Wynkoop and Peter Fabian.  Tutor Perini served as construction manager. BD+C

Related Stories

| Mar 28, 2012

Holden Cancer Center opens at University of Iowa Hospitals and Clinics

The new cancer clinic provides a significant increase in patient space from the prior facility, which was located in an adjacent building.

| Mar 28, 2012

Meridian Design Build Begins work on 38 acre redevelopment project

The project includes construction of a new 150,585-sf cross dock facility that will include full service truck maintenance and repair bays, a truck wash, and approximately 20,000-sf of corporate office space.

| Mar 28, 2012

Tsoi/Kobis & Associates developing master plan for UT Southwestern Medical Center

Firm will spearhead strategies for transforming existing in-patient hospital into state-of-the-art ambulatory care facility.

| Mar 28, 2012

Ideas and input drive stories in online community, noraXchange

Community designed to help building and design professionals address challenges they face in their jobs. 

| Mar 27, 2012

Bank of America Plaza becomes Atlanta's priciest repo

Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.

| Mar 27, 2012

Skanska hires aviation construction expert Bob Postma

Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.

| Mar 27, 2012

Precast concrete used for affordable, sustainable housing in New York

Largest affordable housing development in the nation will provide housing for close to 500,000 people. 

| Mar 27, 2012

Groundbreaking held for Valencia College West Campus Building 10 in Orlando

Project led by design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.

| Mar 27, 2012

Hollister Construction completes LEED Silver bank in Woodland Park, N.J.

Ground-up construction project included installation of solar panels.

| Mar 26, 2012

Jones Lang LaSalle completes construction of $536M Parkview Regional Medical Center

Hospital ushers in new era of local access to advanced medical treatments in Northeast Indiana.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021