flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Japan scraps Zaha Hadid's Tokyo Olympic Stadium project

Sports and Recreational Facilities

Japan scraps Zaha Hadid's Tokyo Olympic Stadium project

Rising costs, growing opposition led country officials to change plans


By BD+C Staff | July 17, 2015
Japan scraps Tokyo Olympic Stadium project

Rendering: Zaha Hadid's proposed Tokyo Olympic Stadium, Japan Sport Council, Creative Commons.

Tokyo will have to find a new signature venue for the 2020 Olympics.

ArchDaily reports that Japan, led by Prime Minister Shinzo Abe, announced today that it is ditching its plans to build an 80,000-seat Olympic Stadium in the city. In 2012, Zaha Hadid's architecture firm, Zaha Hadid Architects, won the rights to design the bicycle helmet-shaped stadium.

The rising price tag was one of the downfalls of the 70-meter-tall, 290,000-sm stadium. In 2014, the cost of the project was 163 billion yen, but that rose to 252 billion yen this year—the equivalent of jumping from $1.3 billion to around $2 billion.

The project was riddled with revisions and delays, along with some serious design flaws. Even as recently as a month ago, Japan was still set on continuing with the stadium, citing that any modifications would lead to construction delays.

Critics said the stadium would have encroached on local green space, like the Jingu Outer Gardens, and would have put a financial strain on future generations. Two Pritzker laureates, Toyo Ito and Fumihiko Maki, created a petition that gained nearly 15,000 signatures to stop the construction of the stadium. Alternate proposals included retrofitting existing stadiums from the 1964 Olympics.

Abe said that despite abandoning the design, the stadium would be ready by 2020 for the Olympics and the Paralympics that year, but that it would not be ready for the 2019 Rugby World Cup.

Zaha Hadid Architects released a statement saying that a revamped project would be ready for the 2019 Rugby World Cup along with the Olympics, and that "it is absolutely right that the benefits and costs of the new National Stadium should be clearly and accurately communicated and understood by the public and decision-makers in Japan and we hope that this is one of the objectives of the review announced by the Prime Minister."

Related Stories

Sports and Recreational Facilities | Oct 30, 2018

Florida’s tallest building could begin construction next spring

SkyRise Miami to offer some hair-raising attractions.

Giants 400 | Oct 12, 2018

Sports venues reach outside their walls

Professional and collegiate facilities invite fans to engage with the community.

Sports and Recreational Facilities | Aug 9, 2018

Populous-designed Buffalo Bills training center expansion will begin construction this fall

Arc Building Partners will lead construction efforts on the project.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Building Team Awards | May 16, 2018

Game, set, match: United States Tennis Association National Campus

Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.

Sports and Recreational Facilities | May 15, 2018

Is this the most environmentally sustainable arena in the country?

The university arena was designed by Architectural Resources Cambridge.

Sports and Recreational Facilities | Apr 19, 2018

Watch a time-lapse of Wrigley Field’s most recent phase of renovations

The renovations took place between October 2017 and April 2018.

Sports and Recreational Facilities | Apr 3, 2018

Westminster College’s new athletic stadium includes a turf field and seating for 2,000

The project is the largest capital improvement project on the campus in over a decade.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021