flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

James Corner Field Operations, designers of the High Line, creates rooftop amenity spaces for three Dumbo office buildings

Office Buildings

James Corner Field Operations, designers of the High Line, creates rooftop amenity spaces for three Dumbo office buildings

The new spaces range from about 8,500 to 11,000 sf and were added to Two Trees Management’s anchor office buildings.


By David Malone, Associate Editor | July 19, 2017
Manhattan Bridge can be seen from James Corner Field Operations' 45 Main Street rooftop

Photo: Two Trees Management, Matthew Williams

Three Dumbo office buildings have been updated with new rooftop amenity spaces designed by James Corner Field Operations. 45 Main Street, 55 Washington Street, and 20 Jay Street represent three anchor office buildings in Dumbo for real estate development firm Two Trees Management.

The new rooftop spaces range from 8,500 to 11,000 sf and include outdoor conference rooms, picnic and dining areas, spaces for screenings and outdoor yoga, and plenty of space for plants. Flexible seating can accommodate those looking to work, collaborate, or relax.

 

45 Main Street rooftop's herringbone-paved carpet and the alcoves are interspersed with planters45 Main Street rooftop. Photo: Two Trees Management, Matthew Williams.

 

45 Main Street’s new 9,520-sf rooftop comprises a series of seven alcoves that line the edge of the roof, two herringbone-paved carpets with moveable furniture, a raised wooden deck that acts as a multi-purpose room, and views of the Manhattan Bridge. An abundance of planters, containing serviceberry, grey birch, flowering dogwoods, hydrangea, and witch hazel, separate the different spaces.

 

A conference table in front of an existing warehouse at the 20 Jay Street rooftop by James Corner Field Operations20 Jay Street rooftop. Photo: Two Trees Management, Matthew Williams.

 

The rooftop at 20 Jay Street is the smallest of the three at 8,175 sf. A V-shaped raised wooden deck functions as a multi-purpose room with the Manhattan skyline as the backdrop. A custom-designed screen provides a surface for watching movies and also frames the deck. Large outdoor conference and dining tables, flexible seating with moveable tables, and chairs and chaise lounges are also included.

 

The 55 Washington rooftop designed by James Corner Field Operations55 Washington rooftop. Photo: Two Trees Management, Matthew Williams.

 

The 55 Washington rooftop provides 11,135 sf of space and is organized by a raised wooden promenade lined with shade trees and furnished with custom benches. The Manhattan Bridge can be viewed from one side while the Brooklyn Bridge can be viewed from the other end. A wooden ramp surrounded by plants leads to the social promenade. An additional three ‘rooms’ step off the promenade: a lounge, an outdoor conference room, and a picnic and dining area.

“Our design goal was to provide unique, lively gathering areas within lush settings in the center of a thriving urban environment while optimizing expansive views of the Brooklyn and Manhattan Bridges and the Manhattan skyline,” says Lisa Switkin, Senior Principal, James Corner Field Operations.

Each rooftop is finished and open for use.

Related Stories

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.

Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: Walsh Group Training and Conference Center, Chicago, Ill.

With its Building Team partners—architect Solomon Cordwell Buenz, structural engineer CS Associates, and M/E engineer McGuire Engineers—Walsh Construction, acting as its own contractor, turned the former automobile showroom and paperboard package facility into a 93,000-sf showcase of sustainable design and construction.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Rice Fergus Miller Office & Studio, Bremerton, Wash.

Rice Fergus Miller bought a vacant and derelict Sears Auto and converted the 30,000 gsf space into the most energy-efficient commercial building in the Pacific Northwest on a construction budget of around $100/sf.

| Sep 24, 2012

Reed Construction completes Lafarge headquarters in Chicago

Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.

| Sep 13, 2012

Margulies Perruzzi Architects completes office design for Pioneer Investments

MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street.

| Sep 11, 2012

New York City releases first energy benchmarking data for private buildings

City is first in U.S. to disclose private-sector building energy data from a mandatory benchmarking policy.

| Sep 7, 2012

Goettsch Partners designs new tower in Abu Dhabi

Al Hilal Bank’s 24-story flagship development provides contemporary office space.

| Sep 7, 2012

Suffolk awarded One Channel Center project in Boston

Firm to manage $125 million, 525,000-sf office building project.

| Sep 7, 2012

Manhattan Construction Co. to build Fairfax office building

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.

| Aug 21, 2012

Hong Kong’s first LEED Platinum pre-certified building opens

Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021