Located on a former World War II air base, Jaguar Land Rover’s Advanced Product Creation Centre includes 50,000-sm of new built space meant to accommodate 3,500 staff in Warwickshire, England. The project combines design, engineering, and production purchasing under one roof for the first time.
The building space features the Jaguar Design Studio, offices, a site-wide restaurant, a 400-seat multipurpose hall, and a visitor building. An internal street connects these amenities to existing buildings in an effort to foster community and maximize the potential for collaboration.
A supporting steel “super-grid” accommodates the wide range of spaces within an overall structural order and correlates with the triangular geometry of the original air base runways on the site. Additionally, Europe’s largest timber roof crowns the building. The timber roof expresses sustainability and includes rooflights that flood the interior with natural light.
See Also: New details released for Universal Studios Japan’s Super Nintendo World
The Advanced Product Creation Centre will focus on creating future autonomous, connected, electrified, and shared mobility technologies.
Related Stories
Office Buildings | Jun 10, 2021
The future of the workplace is social clubs
Office design experts from NELSON Worldwide propose a new concept for the workplace, one that resembles the social clubs of the past.
Office Buildings | Jun 8, 2021
RMJM Milano wins competition to design Sanko Headquarters in Istanbul, Turkey
The project was selected for its sustainable and innovative features.
Office Buildings | Jun 3, 2021
What's next for workplace design?
Balancing personal space and the need for collaboration.
Digital Twin | May 24, 2021
Digital twin’s value propositions for the built environment, explained
Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.
Office Buildings | May 18, 2021
“The Beam” will be Arizona’s first CLT project
RSP Architects designed the building.
Wood | May 14, 2021
What's next for mass timber design?
An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.
Office Buildings | Apr 28, 2021
The Salvation Army’s National Headquarters renovation completes
HGA designed the project.
Steel Buildings | Apr 17, 2021
Speed Core wall system is used for the second time in office building in San Jose
The construction method is expected to knock off three months from the project’s schedule.
Office Buildings | Apr 15, 2021
JetBrains St. Petersburg campus to include large, vertically stepped indoor atrium
UNStudio is designing the project.
Office Buildings | Apr 12, 2021
A Fort Myers, Fla., developer finds growth in an office sector that, post COVID, might be catching its second wind
Seagate Development Group has several office projects near completion.