flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Jacobs Engineering acquires Jordan, Jones and Goulding Inc.

Jacobs Engineering acquires Jordan, Jones and Goulding Inc.


By BD+C staff | August 11, 2010

PASADENA, Calif., Feb 15, 2010 /PRNewswire via COMTEX/ -- Jacobs Engineering Group Inc. (NYSE: JEC) announced today that it has acquired Jordan, Jones and Goulding Inc. (JJG), a 500-person professional services firm based in Atlanta. JJG significantly expands Jacobs position in the North American water and wastewater market, and broadens the Company's strong position in the global aviation, transit, and transportation infrastructure markets.

Jacobs did not disclose the terms of the transaction.

Founded in 1958, JJG is based in Atlanta, Ga., and has 17 offices across the southern U.S. The highly respected company provides engineering, planning and consulting services for water, wastewater, environmental and other clients. The addition of JJG to Jacobs gives both companies the ability to provide comprehensive water solutions for clients, from assessments, planning, and design of new systems to the expansion and upgrade of existing systems.

In making the announcement, JJG President and Chief Executive Officer Don Allen stated, "We expect our employees and clients to benefit greatly from us joining Jacobs. Combining our capabilities with a company that shares our values allows our employees to continue to grow, and it provides a larger platform to better serve our clients."

Jacobs President and Chief Executive Officer Craig Martin said, "JJG has a very talented team. Their expertise in water infrastructure is not only a great complement to Jacobs strengths, but it also positions us for growth." Martin went on to say, "Like many other challenges resulting from the aging infrastructure worldwide, water and wastewater is a critical concern. This acquisition boosts our global capabilities to support public and private clients with the water solutions they urgently need."

Jacobs is one of the world's largest and most diverse providers of technical, professional, and construction services.

Any statements made in this release that are not based on historical fact are forward-looking statements. Although such statements are based on management's current estimates and expectations, and currently available competitive, financial, and economic data, forward-looking statements are inherently uncertain. We, therefore, caution the reader that there are a variety of factors that could cause business conditions and results to differ materially from what is contained in our forward-looking statements. For a description of some of the factors which may occur that could cause actual results to differ from our forward-looking statements please refer to our 2009 Form 10-K, and in particular, the discussions contained under Items 1 - Business, 1A - Risk Factors, 3 - Legal Proceedings, and 7 - Management's Discussion and Analysis of Financial Condition and Results of Operations. We also caution the readers of this release that we do not undertake to update any forward-looking statements made herein.

 

Tags

Related Stories

Multifamily Housing | May 3, 2017

Silicon Valley’s high-tech oasis

An award-winning rental complex takes its design cues from its historic location in Silicon Valley.

Architects | May 3, 2017

Avoiding trouble in paradise: Tips on building successfully in the Caribbean

The island setting itself is at the root of several of these disruptive assumptions.

Engineers | May 3, 2017

At first buoyed by Trump election, U.S. engineers now less optimistic about markets, new survey shows

The first quarter 2017 (Q1/17) of ACEC’s Engineering Business Index (EBI) dipped slightly (0.5 points) to 66.0.

Multifamily Housing | May 2, 2017

Multifamily housing: 7 exciting, inspiring innovations [AIA Course]

This AIA CES course features seven novel approaches developers and Building Teams are taking to respond to competitive pressures and build more quickly and with more attractive offerings.

Multifamily Housing | Apr 26, 2017

Multifamily amenity trends: The latest in package delivery centers

Package delivery centers provide order and security for the mountains of parcels piling up at apartment and condominium communities.

Multifamily Housing | Apr 26, 2017

Huh? A subway car on the roof?

Chicago’s newest multifamily development features an iconic CTA car on its amenity deck. 

BIM and Information Technology | Apr 24, 2017

Reconciling design energy models with real world results

Clark Nexsen’s Brian Turner explores the benefits and challenges of energy modeling and discusses how design firms can implement standards for the highest possible accuracy.

Higher Education | Apr 24, 2017

Small colleges face challenges — and opportunities

Moody’s Investor Service forecasts that closure rates for small institutions will triple in the coming years, and mergers will double.

Projects | Apr 17, 2017

BD+C's 2017 Design Innovation Report

Façades that would make Dr. Seuss smile, living walls, and exterior wall space that doubles as gallery space are all represented in this year's BD+C Design Innovation Report.

Structural Materials | Apr 3, 2017

Best of structural steel construction: 4WTC, Fulton Center, Pterodactyl win AISC IDEAS2 Awards

The annual awards program, sponsored by the American Institute of Steel Construction, honors the best in structural steel design and construction.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021