flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Jacobs agrees to acquire CH2M

Engineers

Jacobs agrees to acquire CH2M

Combined company could challenge AECOM as the world’s top engineering firm.


By John Caulfield, Senior Editor | August 3, 2017

4G Wetlands, the Central Pasco County (Fla.) Beneficial Water Reuse Project, for which CH2M provided design, permitting and services during construction, recently won the Florida Water Environment Association’s 2016 David W. York Water Reuse Project award. Image: CH2M

Jacobs Engineering Group has entered into a definitive agreement to acquire the outstanding shares of CH2M Hill Companies, an Englewood, Colo.-based consulting and program management firm that is a leader in infrastructure, environmental, and government sectors.

Dallas-based Jacobs will finance this deal, valued at $3.27 billion (including assumption of $416 million of CH2M debt), with 60% cash and 40% stock. The firm has secured financing, including a $1.2 billion three-year term loan.

The acquisition is expected to close by the first quarter of 2018. It is subject to approval by CH2M’s shareholders that would own 15% of Jacobs’ stock upon consummation.

Jacobs is already a major player in the oil and chemicals sectors as a consultant, engineer, and project manager. Its other specialties include construction, aerospace, and defense.

In CH2M, Jacobs is acquiring a 71-year-old firm that is a leader in such areas as water infrastructure, transportation, industrial manufacturing, and environmental services.

CH2M, with more than 20,000 associates, is employee owned. It generates about $4.4 billion in annual revenue, with 73% of its business coming from consulting and program management. More than 70% of its clientele is local, state, or federal governments. Its adjusted cash flow, as of June 2017, was $323 million.

The combined company’s $15.1 billion in revenue could challenge AECOM as the world’s largest engineering firm, at a time when the Trump Administration has proposed, in general terms, an infrastructure construction and repair program in the U.S. that would include $1 trillion in public and private funding over a decade.

The combined company would be more heavily weighted toward building and infrastructure than Jacobs is currently. And the combination would surpass AECOM in global design revenue ($10 billion vs. $7.4 billion).

 

Before-and after sector breakdown for Jacob's acquisition of CH2M

Buildings & Infratstructure would be a bigger part of Jacobs' portfolio if its merger with CH2M goes through. Image: Jacobs

 

“This is a major milestone for Jacobs and the industry,” proclaimed Steve Demetriou, Jacobs’ Chairman and CEO, during a webcast to provide analysts with details about the agreement. Demetriou was joined by Bob Pragada, President of Jacobs’ Buildings and Infrastructure & Industrial business unit; and Kevin Berryman, the firm’s EVP and CFO.

None of CH2M’s corporate officials participated in the webcast, and it’s not clear who from CH2M’s C-Suite would be staying on, or whether Jacobs intended to use CH2M’s brand for marketing purposes.

Demetriou did say, though, that one of Jacobs’ top priorities is “retaining talent,” and that the combination would create “career development opportunities” for the combined company’s employees. He also stated that it was not Jacobs’ intention to simply fold CH2M into its operations, but to take advantage of each company’s strengths to become “a premier end-to-end global solutions provider.” 

Jacobs has formed an Integration Management Office, led by Gary Mandel and Lisa Glatch, EVPs with Jacobs and CH2M, respectively. The firm has also hired an outside consultant (which it did not identify during the webcast) to assist the merger. Demetriou will chair an executive steering committee set up to ensure a smooth transition and integration.

Another priority is to deliver cost and cost synergies. Jacobs executives made the point several times that there is minimal overlap in Jacobs’ and CH2M’s clientele and markets, and that both companies have pursued relatively low-risk business strategies that focus on profitability and margins. Pragada pointed specifically to Buildings, Infrastructure, Aerospace, and Technology as “higher margin” sectors that the combined company would pursue.

However, there will be streamlining if this deal goes through. Berryman said Jacobs projects this combination to produce $150 million in annual cost savings by its second full year. Berryman said “at least” 50 of the two firms’ locations worldwide present “combination opportunities.”

During the webcast, some analysts expressed skepticism about this merger, based on past AEC deals that didn't pan out as advertised, and on the fact that this deal makes Jacobs more design oriented.

Executives at Jacobs—which during its history has acquired more than 70 companies—countered that this deal has undergone extensive due diligence of all of CH2M’s projects. More to the point, they said the acquisition is a good fit for Jacobs’ broader three-year strategic growth initiative that began last year.

Demetriou assured analysts that his company has “the accountable leadership in place” to execute the CH2M deal, and to “create a new industry leader and stronger partner.”

Tags

Related Stories

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021