flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Introducing DriftReady Stairs

Sponsored Content Products and Materials

Introducing DriftReady Stairs

PRODUCT OF THE MONTH: DriftReady Stairs’ patent-pending connectors keep stairs stable at rest, yet flexible when a building moves, accommodating seismic movement and interstory drift.


By Construction Specialties | May 1, 2020
Construction Specialties DriftReady Stairs
Construction Specialties DriftReady Stairs

For more than fifty years, Construction Specialties has led the way in solving challenges created by building movement. After working with industry experts and structural engineers across the country, the company is introducing a seismic innovation: DriftReady Stairs.

DriftReady Stairs’ patent-pending connectors keep stairs stable at rest, yet flexible when a building moves, accommodating seismic movement and interstory drift. Construction Specialties conducted two full-scale shake table test programs in the Earthquake Engineering Laboratory at the University of Nevada, Reno. Stairs equipped with the DriftReady connectors surpassed industry-standard interstory drift levels of 2.5 percent — reaching drift levels of up to 4.0 percent.

DriftReady Stairs also reduce the transfer of damaging force back into a structure during building movement, preventing stair connection failures. This helps to ensure safe egress for building occupants — and safe ingress for first responders — during and after a seismic event. For more information, visit csdriftready.com. 

Thanks to their patent-pending connectors, DriftReady Stairs accommodate seismic movement and interstory drift. They reduce the transfer of damaging forces back into a structure during a seismic event, preventing connection failures and ensuring safe egress and ingress. 

csdriftready.com
800.233.8493

Related Stories

| Aug 11, 2010

Education's Big Upgrade

Forty-five percent of the country's elementary, middle, and high schools were built between 1950 and 1969 and will soon reach the end of their usefulness, according to the 2005–2008 K-12 School Market for Design & Construction Firms, published by ZweigWhite, a Massachusetts-based market-research firm.

| Aug 11, 2010

Great Solutions: Technology

19. Hybrid Geothermal Technology The team at Stantec saved $800,000 in construction costs by embedding geothermal piping into the structural piles at the WestJet office complex in Calgary, Alb., rather than drilling boreholes adjacent to the building site, which is the standard approach. Regular geothermal installation would have required about 200 boreholes, each about four-inches in diameter ...

boombox1
boombox2
native1

More In Category




Products and Materials

Top products from AIA 2024

This month, Building Design+Construction editors are bringing you the top products displayed at the 2024 AIA Conference on Architecture & Design. Nearly 550 building product manufacturers showcased their products—here are 17 that caught our eye.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021