The International Olympic Committee (IOC) selected Danish firm 3XN to design its new headquarters after a multi-stage, international architectural competition that concluded earlier this year.
The IOC and 3XN have now released the first renderings of the project, which is located on a 258,333-sf site on the banks of Lake Geneva in Lausanne, Switzerland. The new building will bring together 600 employees currently working in disparate offices throughout the city.
“In recognition of the symbolism of the Olympic Games and needs of the organization, we designed the new IOC headquarters around three key elements: movement, flexibility and sustainability,” said Jan Ammundsen, Senior Partner with 3XN.
“With its dynamic, undulating façade, the building will appear different from all angles and convey the energy of an athlete in motion," added Ammundsen. "Its interior is designed with as few structural constraints as possible. This open and flexible environment will adapt to multiple work styles now and in the future. Our design is also intended to encourage interaction, communication and knowledge sharing among staff.”
3XN’s entire design is built upon respect for the site and sustainable principles. The building features many energy efficient systems, including lake water pumping, photovoltaics, and daylight optimization.
The new headquarters is located within a park on the shores of Lake Geneva and adjacent to historic Château de Vidy, which has been the iconic home of the IOC. 3XN’s design is intended to respect both the château’s legacy and park setting and make as soft a transition as possible from park to building.
Related Stories
| Sep 12, 2011
PVs play new roles as a teaching tool
Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.
| Sep 12, 2011
Living Buildings: Are AEC Firms up to the Challenge?
Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.
| Sep 12, 2011
First phase of plan to revitalize Florida's Hialeah Park announced
This is the first project of a master plan developed to revive the historic racetrack.
| Sep 9, 2011
Kauffman Center for the Performing Arts in Kansas City opens this month
Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.
| Sep 9, 2011
$22 million investment made in energy efficient building maker
The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country.
| Sep 8, 2011
Two promoted at ajc architects
ajc architects announced the promotion of Joshua W. Greene, AIA, NCARB, LEED Green Associate to Associate Principal of the firm. The firm also announced that Kent Rigby, AIA, has been promoted to Associate Architect.
| Sep 7, 2011
KSS Architects wins AIA NJ design award
The project was one of three to win the award in the category of Architectural/Non-Residential.
| Sep 7, 2011
Administration, Maintenance and Operations Facility in South Bend achieves LEED Platinum
The facility achieved 52 LEED points, including those for site selection, energy, materials and resources and innovation.
| Sep 6, 2011
Construction on Beijing's tallest building starts next week
The 108 floor mixed-use skyscraper consists of offices, apartments, hotels and shopping malls on the lower floors.