The International Olympic Committee (IOC) selected Danish firm 3XN to design its new headquarters after a multi-stage, international architectural competition that concluded earlier this year.
The IOC and 3XN have now released the first renderings of the project, which is located on a 258,333-sf site on the banks of Lake Geneva in Lausanne, Switzerland. The new building will bring together 600 employees currently working in disparate offices throughout the city.
“In recognition of the symbolism of the Olympic Games and needs of the organization, we designed the new IOC headquarters around three key elements: movement, flexibility and sustainability,” said Jan Ammundsen, Senior Partner with 3XN.
“With its dynamic, undulating façade, the building will appear different from all angles and convey the energy of an athlete in motion," added Ammundsen. "Its interior is designed with as few structural constraints as possible. This open and flexible environment will adapt to multiple work styles now and in the future. Our design is also intended to encourage interaction, communication and knowledge sharing among staff.”
3XN’s entire design is built upon respect for the site and sustainable principles. The building features many energy efficient systems, including lake water pumping, photovoltaics, and daylight optimization.
The new headquarters is located within a park on the shores of Lake Geneva and adjacent to historic Château de Vidy, which has been the iconic home of the IOC. 3XN’s design is intended to respect both the château’s legacy and park setting and make as soft a transition as possible from park to building.
Related Stories
| Sep 5, 2012
Pagano joins Thornton Tomasetti as Vice President in Newark office
Pagano is a Certified Energy Planner and Certified Energy Manager through the Association of Energy Engineers.
| Aug 30, 2012
John S Clark Co. completes teaching lab at UNC Wilmington
Three-story building provides offices, classrooms, and labs.
| Aug 29, 2012
BOND completes South Cove Community Health Center
$11 million, 21,000 square foot community health center opens in Quincy, Mass.
| Aug 29, 2012
Mamayek joins HDR as Design Principal in Boston
He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.
| Aug 28, 2012
McCarthy begins construction on transportation center at Bob Hope Airport
Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.
| Aug 28, 2012
Wisnewski Blair & Associates changes name to HGA Mid-Atlantic
New name reflects firm's growing design resources on East Coast.
| Aug 24, 2012
Meis heads to Woods Bagot Sport
Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.
| Aug 21, 2012
Under 40 Leadership Summit slated for October 3-5 in Chicago
Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.
| Aug 21, 2012
Hong Kong’s first LEED Platinum pre-certified building opens
Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.