flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

International Green Construction Code will include option for outcome-based approach

International Green Construction Code will include option for outcome-based approach

The outcome-based approach requires the building owner to provide the building’s utility bills for a 12-month period within three years. 


By Peter Fabris, Contributing Editor | November 26, 2014
Photo: krishnan via FreeDigitalPhotos.net
Photo: krishnan via FreeDigitalPhotos.net

The 2015 International Green Construction Code (IgCC) will include the option to use an outcome-based approach when complying with local building energy codes, the first time the IgCC has allowed this method.

Previously, building energy codes relied on two main pathways to demonstrate compliance: performance (modeling energy consumption), and prescriptive measures (following code-defined values for individual building components). Both approaches fail to fully account for how buildings use power once they are completed, occupied, and maintained, according to the Institute for Market Transformation (IMT).

The new provision will help communities to ensure energy-efficient buildings are meeting performance expectations. The outcome-based approach requires the building owner to provide the building’s utility bills for a 12-month period within three years. This will ease pressure on code departments and align with the growing number of energy benchmarking regulations across the country, IMT says.

The decision to include an outcome-based pathway in the 2015 IgCC will directly influence future editions of the IgCC and other codes such as the Energy Conservation Code. This should smooth the process of including ASHRAE Standard 189.1 and the LEED green building program into the development of the IgCC, IMT says.

(http://www.imt.org/news/the-current/outcome-based-pathway-is-voted-into-the-2015-igcc)

Related Stories

Codes and Standards | Jul 29, 2020

Crackdowns grow on construction firms that fail to follow COVID-19 guidelines

States, cities, and OSHA enforce social distancing, hand-washing regulations.

Codes and Standards | Jul 28, 2020

California utility adopts climate emergency declaration

Sacramento-region company commits to working towards carbon neutrality by 2030.

Codes and Standards | Jul 23, 2020

North Carolina will stop relying on FEMA flood mapping

State will identify flood zones on its own.

Codes and Standards | Jul 22, 2020

New version of IAPMO’s Water Demand Calculator is available

Enhanced features include selection between single- and multifamily buildings.

Codes and Standards | Jul 22, 2020

Mobile app calculates sound transmission for wood-framed assemblies

American Wood Council tool for floor-ceiling assemblies.

Codes and Standards | Jul 22, 2020

Architecture billings remain in negative territory, begin to stabilize

Fewer architecture firms report declining billings this month.

Codes and Standards | Jul 20, 2020

N.Y. construction firm to pay $1.5 million to settle sexual harassment claim

Managers said to demand sex for pay and OT opportunities.

Codes and Standards | Jul 16, 2020

Tips to make optimal use of salvaged materials

Integrated teams, staging warehouse, and looking early and often, among recommendations.

Codes and Standards | Jul 15, 2020

Georgia gives the go-ahead for tall mass timber construction

Standards review scheduled to be completed by July 2021.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021