flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

International Green Construction Code will include option for outcome-based approach

International Green Construction Code will include option for outcome-based approach

The outcome-based approach requires the building owner to provide the building’s utility bills for a 12-month period within three years. 


By Peter Fabris, Contributing Editor | November 26, 2014
Photo: krishnan via FreeDigitalPhotos.net
Photo: krishnan via FreeDigitalPhotos.net

The 2015 International Green Construction Code (IgCC) will include the option to use an outcome-based approach when complying with local building energy codes, the first time the IgCC has allowed this method.

Previously, building energy codes relied on two main pathways to demonstrate compliance: performance (modeling energy consumption), and prescriptive measures (following code-defined values for individual building components). Both approaches fail to fully account for how buildings use power once they are completed, occupied, and maintained, according to the Institute for Market Transformation (IMT).

The new provision will help communities to ensure energy-efficient buildings are meeting performance expectations. The outcome-based approach requires the building owner to provide the building’s utility bills for a 12-month period within three years. This will ease pressure on code departments and align with the growing number of energy benchmarking regulations across the country, IMT says.

The decision to include an outcome-based pathway in the 2015 IgCC will directly influence future editions of the IgCC and other codes such as the Energy Conservation Code. This should smooth the process of including ASHRAE Standard 189.1 and the LEED green building program into the development of the IgCC, IMT says.

(http://www.imt.org/news/the-current/outcome-based-pathway-is-voted-into-the-2015-igcc)

Related Stories

Codes and Standards | Nov 6, 2018

AIA releases 13 new and updated contract documents

Includes new Contractor-Subcontractor Master Agreement.

Codes and Standards | Nov 1, 2018

Several barriers holding back widespread construction of zero energy buildings

Code improvements and voluntary programs could add momentum.

Codes and Standards | Oct 31, 2018

Boston’s new flood protection plan centers on new parks

Initiative would add 67 acres of public open space.

Codes and Standards | Oct 30, 2018

San Francisco plans tougher seismic building codes

Recommendations include addressing geotechnical issues like those faced by Millennium Tower.

Codes and Standards | Oct 26, 2018

Tall Mass Timber code proposals approved at Intl. Code Council public comment hearings

Proposals now go to online voting; final outcome expected in December.

Codes and Standards | Oct 25, 2018

Low-income neighborhoods could benefit most from green roofs

Those areas face the biggest risk from extreme heat.

Codes and Standards | Oct 24, 2018

Building design critical to prevent school shootings

Safety must be balanced with welcoming environment.

Codes and Standards | Oct 23, 2018

Codes in Florida Panhandle made buildings vulnerable to Hurricane Michael

Less stringent codes in northern parts of state linked to devastation.

Codes and Standards | Oct 19, 2018

Global Green Tag production certification standard will launch in U.S. at end of year

Australian program recognized by WELL, claims compliance with LE.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021