Noted green building expert, author and sustainability planning consultant, Jerry Yudelson will address the ARBS conference in Melbourne, Australia on May 7, 2012. In addition, he will teach a “Master Class” on May 8th for building industry participants on designing for high-performance in green buildings.
Yudelson says, “The key issue now in the green building industry is how these construction projects perform, using actual operating data, not fanciful projections. For the past two years, I have researched this issue internationally, and in this conference, I will share some of the results of my global research with the Australian building industry.”
Yudelson’s keynote speech will focus on the performance of the highest-rated green buildings, with the topic: “If It Doesn’t Perform, It Can’t Be Green.” As a result, the audience will receive a “sneak preview” of Yudelson’s forthcoming book, The World’s Greenest Buildings: Promise vs. Performance in Sustainable Design, to be published early in 2013 in London by Routledge Taylor & Francis, a leading UK architectural press.
The green building consultant continues, “If we are serious about cutting our carbon emissions, we have to deal with commercial buildings, which globally account for nearly 20 percent of all emissions of greenhouse gases. In my new book and in this presentation, I’m challenging the building industry—and those involved in green building and sustainable design in particular—to get serious about the performance issue.”
A professional engineer and experienced sustainability consultant, Yudelson has been involved with promoting the LEED green building rating system for more than 10 years and is the author of twelve (12) books on the subject of green buildings, green homes, green marketing, water conservation and sustainable development. In 2011, the US Green Building Council named him to the first class of LEED Fellows. +
Related Stories
Modular Building | Jan 21, 2015
Chinese company 3D prints six-story multifamily building
The building components were prefabricated piece by piece using a printer that is 7 meters tall, 10 meters wide, and 40 meters long.
| Jan 21, 2015
Tesla Motors starts construction on $5 billion battery plant in Nevada
Tesla Motors’ “gigafactory,” a $5 billion project on 980 acres in Sparks, Nev., could annually produce enough power for 500,000 electric cars.
| Jan 20, 2015
Daring hotel design scheme takes the shape of cut amethyst stone
The Dutch practice NL Architects designed a proposal for a chain of hotels shaped like a rock cut in half to reveal a gemstone inside.
| Jan 20, 2015
Avery Associates unveils plans for London's second-tallest tower
The 270-meter tower, dubbed the No. 1 Undershaft, will stand next to the city's "Cheesegrater" building.
| Jan 20, 2015
AIA course: Building with brick, stone, and masonry
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Jan 19, 2015
HAO unveils designs for a 3D movie museum in China
New York-based HAO has released designs for the proposed Bolong 3D Movie Museum & Mediatek in Tianjin.
| Jan 19, 2015
Gaudi’s first work outside Spain will be a chapel in Chile
Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his designs.
| Jan 19, 2015
Architecture for Humanity closes office, plans to file for bankruptcy
After more than 15 years of work, the nonprofit design group Architecture for Humanity has closed its San Francisco office and plans to file for Chapter 7 bankruptcy protection.
| Jan 19, 2015
Four Seasons tower will be Boston's tallest
On Jan. 14, 2015, developer Carpenter & Company and executives from the Four Seasons broke ground on the Four Seasons Hotel & Private Residences, which will become the tallest building in Boston at 699 feet.
| Jan 19, 2015
Mystery buyer pays highest ever price for NYC residence
The 89th and 90th floors of 157 W. 57th Street have just been purchased for more than $100 million.