Integrated Design Group(ID) completed construction at the North Hall Data Center located at the University of California at Santa Barbara (UCSB). Integral to the university’s computing operations, the data center, which contained enterprise computing capabilities and all campus network connections, was fully operational during the project, allowing the university community to access the servers normally and not cause disruption to the institution’s computing.
A major client goal was for the new research data center to become flexible and scalable in order to provide the opportunity for future expansion as needed. Although the existing facility posed significant limitations on interior clearances, restricting both the depth of the raised floor and the overall height within the computer room, ID was able to nearly double the raised floor space by using innovative cooling technology. With updated mechanical and electrical systems, the research data center is now able to support the latest in high performance computing.
By utilizing the 415/240 V AC power distribution system, which is standard in most European and Asian countries, ID was able to implement efficiency gains within the data center, and provide monetary savings for the university. This application offers a significant amount of energy improvement over North America’s standard of 208/120 V. Delivering power to IT loads at 415/240 V instead of 208/120 V eliminates power distribution unit (PDU) transformers. This elimination not only offers energy efficiency gain, but also reduces copper costs and floor loading while freeing up additional space within the data center. +
Related Stories
Movers+Shapers | Jun 14, 2016
VERTICAL INTEGRATOR: How Brooklyn’s Alloy LLC evolved from an architecture firm into a full-fledged development company
Led by an ambitious President and a CEO with deep pockets, Alloy LLC's six entities control the entire development process: real estate development, design, construction, brokerage, property management, and community development.
Office Buildings | Jun 14, 2016
Let's not forget introverts when it comes to workplace design
Recent design trends favor extroverts who enjoy collaboration. HDR's Lynn Mignola says that designers need to accommodate introverts, people who recharge with solitude, as well.
Building Team | Jun 13, 2016
BD+C launches Women in Design+Construction Conference
Inaugural 2.5-day event will convene 125+ leading AEC women in Dana Point, Calif., November 9-11, for professional development, networking, and career training.
University Buildings | Jun 9, 2016
Designing for interdisciplinary communication in university buildings
Bringing people together remains the main objective when designing academic projects. SRG Design Principal Kent Duffy encourages interaction and discovery with a variety of approaches.
BIM and Information Technology | Jun 7, 2016
Conquer computational design: 5 tips for starting your journey
Data-driven design expert Nathan Miller offers helpful advice for getting your firm ready to use CD tools and concepts.
BIM and Information Technology | Jun 7, 2016
6 ways smart AEC firms are using computational design methods
Rapid prototyping, custom plug-ins, and data dashboards are among the common applications for computational design.
Building Team | Jun 2, 2016
Managing risk when building in challenging locations
AEC firms recognize the upsides of exploring new, emerging markets. Whitehorn Financial's Steve Whitehorn offers four principles that can help guide you to success.
Airports | Jun 1, 2016
LaGuardia Airport’s massive redevelopment begins construction
The development consortium has secured financing for the $4 billion project, and signed an operating lease through 2050.
Building Team Awards | Jun 1, 2016
Multifamily tower and office building revitalize Philadelphia cathedral
The Philadelphia Episcopal Cathedral capitalizes on hot property to help fund much needed upgrades and programs.
Building Team Awards | Jun 1, 2016
Central utility power plant takes center stage at UC San Diego Jacobs Medical Center
An undulating roof, floor-to-ceiling glass, and façade scheme give visual appeal to a plant that serves the 10-story medical center.