flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Insulated wall system cuts down installation time

Products and Materials

Insulated wall system cuts down installation time

ProGUARD DP is a combined system cuts installation time down to one-third that of traditional wall systems.


By David Malone, Associate Editor | August 30, 2017
The ProGuard concrete Board system being used
The ProGuard concrete Board system being used

The ProGUARD DP Insulated Concrete Board system uses fully engineered panels that offer thermal protection with ship-lapped edges to eliminate thermal breaks and meet continuous insulation requirements.

ProGUARD DP is a combined system that eliminates the separate steps of the drainage plane, insulation, wire lathe, and mortar bed to cut installation time down to one-third that of traditional wall systems. The concrete board and insulation board are laminated together, which results in the use of a quarter-inch concrete board (as opposed to a half-inch) for a more lightweight assembly than in traditional systems.

 

ProGuard used on a building

 

ProGUARD DP can be used with thin brick, thin natural stone, thin porcelain tile, thin manufactured stone, stucco, and synthetic stucco.

Related Stories

| Apr 27, 2012

GE launches electric vehicle charging platform

WattStation Connect provides owners a user-friendly method to manage, monitor and maintain their EV charging ecosystem network.

| Apr 24, 2012

McLennan named Ashoka Fellow

McLennan was recognized for his work on the Living Building Challenge.

| Apr 23, 2012

AAMA releases updated specification for anodized aluminum

AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.

| Apr 20, 2012

Century-old courthouse renovated for Delaware law firm offices

To account for future expansion, Francis Cauffman developed a plan to accommodate the addition of an 8-story tower to the building.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 19, 2012

Holcim cement plants recognized at PCA Spring Meeting

The Holly Hill plant received the PCA’s Chairman’s Safety Performance Award in recognition of their exceptional health and safety programs. The Theodore plant received the Environmental Performance Award in recognition of the steps they take beyond those required by laws, regulations and permits to minimize their impact on the environment.

| Apr 18, 2012

Positive conditions persist for Architecture Billings Index

The AIA reported the March ABI score was 50.4, following a mark of 51.0 in February; greatest demand is for commercial building projects.

| Apr 17, 2012

FMI report examines federal construction trends

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.

| Apr 16, 2012

University of Michigan study seeks to create efficient building design

The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.

boombox1
boombox2
native1

More In Category

Products and Materials

Top products from AIA 2024

This month, Building Design+Construction editors are bringing you the top products displayed at the 2024 AIA Conference on Architecture & Design. Nearly 550 building product manufacturers showcased their products—here are 17 that caught our eye.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021