Insulated Metal Panels: A Class Act at ASU

Sponsored Content Metals

Insulated Metal Panels: A Class Act at ASU


By Metl-Span | July 21, 2021
ASU Fusion
ASU Fusion

As anyone in the construction industry knows, planning makes perfect. That sentiment nicely sums up the success of ASU Fusion on First—a recent 283,000-square-foot tech-driven project for Arizona State University’s (ASU’s) Downtown Phoenix campus. The new student apartment community, which also includes designated academic space, is a design and performance standout, thanks to the collaboration between Metl-Span® and Arizona-based architectural cladding contractor True Metal Solutions (TMS).

This new-build project was a combination of academic and residential space where the first three floors contain a high-tech innovation hub for the arts geared towards such academic programs as design, popular music and fashion. Floors four through 17 are apartment-style student housing with living space for up to 550 students. Damon Brown, Project Manager for True Metal Solutions, summarizes, “The task that we were given was to wrap the entire exterior in insulated metal wall panels (IMPs) while maintaining a specific aesthetic required by the university. Metl-Span’s CF Striated IMPs were a great solution.” 

TMS Director of Preconstruction, Pat Brackney, adds, “At the very onset of design, one of the client's expectations was that this be an airtight structure. There was considerable time spent working with Metl-Span to achieve that as a top priority. The Metl-Span CF Striated insulated metal panels provide that kind of single solution. Plus, it is a really attractive product to use for the entire skin.”

Metl-Span IMPs also played a big role in meeting an aggressive schedule with a mid-July (2021) completion date to accommodate students for the fall semester, all while supporting the project’s performance and design goals. Pat explains, “Putting up this panel allowed us to get the project completed on time, but also, from a design standpoint, it was really exciting to see what they were able to achieve on a building that required a pleasing aesthetic component.”

The Metl-Span CF Striated insulated metal panel is an attractive alternative to typical flat wall panels. The exterior face is lightly profiled with narrow longitudinal striations, which create a subtle shadow effect but exhibit a virtually flat appearance from a short distance away.

ASU exterior

To maximize the benefits, the project team utilized the CF Striated panels in varied colors and sizes. Additionally, they used the reveal and the windows in such a way as to create an interesting facade. Pat elaborates: “The design team chose to use staggered, non-continuous reveals at the slab edges, anddifferent sizes of vertical panels, creating a unique, interesting and pleasing architectural design.”

Kellen Johnson, the Metl-Span sales representative on the project, adds, “Since Metl-Span didn't have a standard slab-edge detail for this exact configuration, our team, which included engineering experts, worked with TMS and the design team to find the perfect solution for integrating the Metl-Span panels into the weathertightness at the slab edges at every level—something we had never really seen before.”

Additionally, recalls Damon, “The project evolved from the original design where they added gypsum board and waterproofing as part of a prefab aspect. We started about three months earlier with prefabbing—just waterproofing and installing hat channels on DensGlass.The framers then stood those up in place prior to panels being installed. That was not something they required at the beginning during the design process, but it ultimately added to the complexity and unique aesthetic.”

As Kellen adds, “The Metl-Span CF IMPs are just a quicker install with a higher R-value, and you get a nice architectural look at the same time.”

The color choices were purposeful as well. Pat says that many ASU projects use similar custom Copper Metallic finishes—colors more frequently seen in the Tempe area rather than in Downtown Phoenix. The 3-inch-thick, 42-inch-wide panels used for this project were in a mix of colors that included Finest Silk, Industrial Age, and Roman Brick (all custom), in addition to Copper Metallic.

Pat remarks how exciting it is to see an insulated metal panel as an architectural feature. “There’s a perception that this type of panel is used for warehouses or other industrial settings. The building is a beautiful addition to downtown. To even present an insulated metal panel in this kind of building with these features is exciting. I'm glad to see it being used this way.” 

ASU and downtown Phoenix

Damon agrees, stating, “I think it showcases what insulated metal panels are capable of—architecturally and aesthetically.”

The construction, which took approximately 10 months to complete, required a great deal of planning and coordination, with swing stages operating up to five crews at a time. Pat shares, “Because of the accelerated schedule,there was a long and comprehensive preconstruction design phase.Even with a tight schedule, we didn't feel rushed because of the preplanning and having all these details worked out, such as the slab edges and resizing the panels so that when the windows went in, we didn't have to cut on-site. Everything fit perfectly due to an abundance of coordination and flexibility from the design teamfrom the beginning.”

Kellen notes that the detailed planning made all the difference. He says, “We had to take into consideration all the nitty gritty details, like how many panels could go on each pallet and how many colors of each panel were on each pallet. From the architectural planning through the metal product side from a manufacturing standpoint, there was great collaboration with TMS for us to deliver the panels the way they needed them, in order for the project to run smoothly.”

Damon praises Metl-Span, sharing, “They did such a good job of putting a comprehensive list together of everything we needed based on the conversations we had. They really made it easy for us to succeed.”

Indeed, Fusion on First presents “an image of innovation and progressive ideals,” as noted by ASU. The collaborative effort between the developer, the architecture firm (Studio Ma), Metl-Span, and TMS resulted in a positive construction experience as well as a beautifully designed, high-quality building that will serve ASU’s student body for years to come. 

 

ABOUT THE PROJECT

Architect: Studio Ma (Phoenix, Arizona)

General Contractor: DPR Construction

Architectural Cladding Contractor: True Metal Solutions, LLC (Phoenix, Arizona)

Completion Date: July 2021

Metl-Span Products:
CF Striated, 3” thick, 42” wide, in color Finest Silk (custom color). 23,100 sq. ft.
CF Striated, 3” thick, 42” wide, in color Copper Metallic. 38,062 sq. ft.
CF Striated, 3” thick, 42” wide, in color Industrial Age (custom color). 7,612 sq. ft.
CF Striated, 3” thick, 42” wide, in color Roman Brick (custom color). 17,850 sq. ft.

Tags

Related Stories

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

Sponsored | | Nov 20, 2013

Four faces of curb appeal

The Furniture Row retail center in Charlotte, N.C., incorporates four specialty stores in a distinctive, efficient structure. 

| Nov 18, 2013

The builder’s building

Versatility topped Ron Cleveland’s list of priorities when he and his wife decided to construct a new building in Beaumont, Texas, to accommodate the two businesses they jointly own. Cleveland also wanted to create a structure that would serve as an effective marketing tool for his construction firm. An 11,526-sf custom metal office building met both goals.

| Nov 15, 2013

Metal makes its mark on interior spaces

Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well. 

| Oct 30, 2013

Metal roof design tips: The devil is in the details

This AIA/CES-approved presentation provides information regarding proper design to prevent possible infiltration from the roof system into the building. It also works as a guide when designing a roof to allow for proper water runoff.

| Oct 28, 2013

Metal roofs are topping more urban dwellings

Given their durability and ease of use, metal roofs have been a common feature on rural houses for decades. Now they’re becoming an increasingly popular choice on urban dwellings as well. 

| Oct 23, 2013

Some lesser-known benefits of metal buildings

While the durability of metal as a construction material is widely recognized, some of its other advantages are less commonly acknowledged and appreciated.  

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

Building Enclosure Systems | Mar 13, 2013

5 novel architectural applications for metal mesh screen systems

From folding façades to colorful LED displays, these fantastical projects show off the architectural possibilities of wire mesh and perforated metal panel technology.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021