flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Inside look: Products used in Bloomington Grove | Lillian Court

Products and Materials

Inside look: Products used in Bloomington Grove | Lillian Court


By BD+C Staff | March 27, 2018

The main products and systems Dan Withee, AIA, LEED AP, and his team from Withee Malcolm Architects specified to achieve the “California Mission” style preferred by the local community for Bloomington Grove | Lillian Court, Bloomington, Calif. (San Bernardino County):

 

Appliances

Frigidaire FHWC3625MB hood vent (black)

Frigidaire FFEF3015PB range (black)

Frigidaire FFEF3009PB range (black) - accessible units

Frigidaire FFHT1826L refrigerator (1BR)

Frigidaire FFHT2117LB refrigerator (2/3BR)

Frigidaire FFBD241NB dishwasher (black)

 

Bath furnishings

Moen Creative Specialties YB2218CH/YB2224CH towel bars

Moen DN2160Ch shower rod (chrome)

Nutone 84024CHG medicine cabinet (chrome frame)

Stanley Hardware 7046 ¾-inch MDF closets (white)

 

Cabinets (supplied by Professional Cabinet Services)

Hamilton RTF concealed sable (kitchen)

Hamilton RTF concealed white (bath/linen)

 

Cabinet hardware

RSI AHK1-BN brushed nickel

RSI Andorra AHP11-BN (accessible units)

 

Doors (apartment units)

Therma-Tru Smooth Star 2-panel square top - entry

Masonite MDF molded 2-panel square top  -interior

Masonite MDF molded 2-panel square top bypass sliding – wardrobe

 

Door hardware

Kwikset Metal Interconnect (oil-rubbed bronze) – entry doors

Kwikset Kingston (oil-rubbed bronze) – unit interiors

 

Exterior finishes

Omega ColorTek Stucco Medium Sand Float 20/30

Omega Foam Tek

 

Flooring

Shaw Home Foundations Flooring Freebird HGG48 carpet (Barn Owl) – bedrooms, upper hall

Armstrong Stratamax (X4515) – bath, laundry closet

Reward Luxury Vinyl Flooring 6X48 (Golden Oak, Teak Botanica)

 

Lighting

Minka 1002-126-PL kitchen (Belcaro walnut/white acrylic)

Sea Gull Lighting 79565BLE-782 ceiling (Heirloom bronze)

Sea Gull Lighting 15030BLE-782 ceiling fan (Heirloom bronze)

Sea Gull Lighting 44627BLE-782 bath vanity (Heirloom bronze)

Sea Gull Lighting 44119BLE-782 wall sconce (Heirloom bronze)

Sea Gull Lighting 88240D-780 dark-sky-friendly patio (burled iron)

 

Plumbing

Cleveland Faucet Group CA40512 kitchen faucet with 116711 1.5 gpm aerator (chrome)

Cleveland Faucet Group 40712 bath faucet (chrome)

Moen 22213/22129 kitchen sinks (stainless)

InSinkErator Badger 1-1½ hp garbage disposal

Symmons H421-V hand shower with 1.5 gpm flow restrictor (chrome) -accessible units

Vortens 3521 Venezia bath sink (white)

Vortens 3140/3475 Loretta toilet (white)

Fiber Care Baths ET60-32HC shower/tub enclosure (white)

 

Roofing

Eagle Roofing Tucson Blend, Capistrano SCC 8806

 

Windows

Green World Windows Low-E3 with argon triple-pane

 

Window blinds

Graber 2-inch vinyl, horizontal, standard valance, wand tilt (off-white)

 

INTERIOR FINISHES

 

Plastic laminate

Wilsonart Blackstar Granite 4551-60 no-drip edge – kitchen

Wilsonart Granite 4550-60 no-drip edge – bath

 

Paint

Sherwin-Williams Duration Home SW 7010 White Duck semi-gloss – doors and trim

Sherwin-Williams Duration Home SW 7010 White Duck satin – walls/ceiling

 

Unit interior millwork

El & El Wood Products 7/16-inch x 2½-inch primed FJ711

El & El Wood Products 5/8-inch x 2½-inch primed FJ711

Related Stories

| Apr 3, 2012

Educational facilities see long-term benefits of fiber cement cladding

Illumination Series panels made for a trouble-free, quick installation at a cost-effective price. The design for Red Hawk Elementary School stems from the desire to create a vibrant place for kids to learn. In an effort to achieve this design, RB+B Architects selected Nichiha USA to provide a durable yet modern, contemporary exterior finish.

| Mar 22, 2012

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 13, 2012

Commercial glazer Harmon expanding into Texas

Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

| Mar 5, 2012

Franklin Institute in Philadelphia selects Skanska to construct new pavilion

The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.

| Mar 1, 2012

Intelligent construction photography, not just pretty pictures

Our expert tells how to organize construction progress photos so you don’t lose track of all the valuable information they contain.

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

| Feb 22, 2012

Suffolk awarded Boston post office renovation project

Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021