flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

InPro’s bio-content becomes Cradle-to-Cradle CertifiedCM Silver

InPro’s bio-content becomes Cradle-to-Cradle CertifiedCM Silver

Two main components of G2 Blend formula now C2C Certified Silver.


By Posted by Tim Gregorski, Senior Editor | June 15, 2012

The biopolymer component of InPro’s revolutionary G2 Blend formula has just become Cradle to Cradle CertifiedCM Silver from Cradle to Cradle Products Innovation Institute. McDonough Braungart Design Chemistry (MBDC) has licensed the certification mark along with the Cradle to Cradle protocols to the Institute, which is responsible for certifying products.

NatureWorks’ Ingeo biopolymer, made from plants, not oil, is the first product of its kind to become Cradle to Cradle Certified Silver. InPro combines Ingeo with Eastman Chemical’s PETG, which also holds a C2C Silver certificate. InPro’s formula also contains recycled content. All three components give G2 Blend significant impact resistance for its interior protection products.

“With G2 Blend, we wanted to completely revolutionize interior protection products, and we were the first to step beyond traditional polymers,” said Mark Alan, senior vice president of product management and development at InPro. “We had toyed with plain PETG for six years, but it didn’t live up to our performance expectations. We abandoned it because it was just too brittle, especially in field fabrication.

“By combining Ingeo, PETG and some recycled content, we arrived at a much-more-durable formula,” Alan said. He went on to say InPro’s G2 Blend biopolymer products continue to rack up impressive sales numbers. “We keep having to move the sales target for the biopolymer products because the market is buying well ahead of our projections. I’ll gladly do that math.”

Like NatureWorks and Eastman Chemical, InPro is staying in the lab, and pushing R&D to reach beyond past-generation plastics. “The market wants to know we’re doing our part to take material science to the next level, and then the one beyond that,” Alan said. “R&D can often take us out into unexplored territory, but that’s what innovation is all about.” +

Related Stories

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Sep 13, 2010

Stadium Scores Big with Cowboys' Fans

Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

| Sep 13, 2010

Committed to the Core

How a forward-looking city government, a growth-minded university, a developer with vision, and a determined Building Team are breathing life into downtown Phoenix.

| Sep 13, 2010

Conquering a Mountain of Construction Challenges

Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.

| Sep 13, 2010

Data Centers Keeping Energy, Security in Check

Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation's largest commercial user of electric power. With major technology companies investing heavily in new data centers, it's no wonder Building Teams see these mission-critical facilities as a golden opportunity, and why they are working hard to keep energy costs at data centers in check.

| Sep 13, 2010

3D Prototyping Goes Low-cost

Today’s less costly 3D color printers are attracting the attention of AEC firms looking to rapidly prototype designs and communicate design intent to clients. 

| Aug 11, 2010

Cubellis principals reorganize as CI design

Former principals of Cubellis Inc. have formed ci design "with a stellar group of projects in the United States and internationally," states John Larsen who, with Richard Rankin and Christopher Ladd, is leading the architecture and planning firm.

| Aug 11, 2010

Leo A Daly changes name of STH, completes acquisition

LEO A DALY  has changed the name of STH Architectural Group to the name of its parent company, Leo A Daly. STH was acquired  in February 2009 as a strategic move to accelerate growth in its core business sectors and to strengthen the firm's presence in the Florida market.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021