flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

InPro’s bio-content becomes Cradle-to-Cradle CertifiedCM Silver

InPro’s bio-content becomes Cradle-to-Cradle CertifiedCM Silver

Two main components of G2 Blend formula now C2C Certified Silver.


By Posted by Tim Gregorski, Senior Editor | June 15, 2012

The biopolymer component of InPro’s revolutionary G2 Blend formula has just become Cradle to Cradle CertifiedCM Silver from Cradle to Cradle Products Innovation Institute. McDonough Braungart Design Chemistry (MBDC) has licensed the certification mark along with the Cradle to Cradle protocols to the Institute, which is responsible for certifying products.

NatureWorks’ Ingeo biopolymer, made from plants, not oil, is the first product of its kind to become Cradle to Cradle Certified Silver. InPro combines Ingeo with Eastman Chemical’s PETG, which also holds a C2C Silver certificate. InPro’s formula also contains recycled content. All three components give G2 Blend significant impact resistance for its interior protection products.

“With G2 Blend, we wanted to completely revolutionize interior protection products, and we were the first to step beyond traditional polymers,” said Mark Alan, senior vice president of product management and development at InPro. “We had toyed with plain PETG for six years, but it didn’t live up to our performance expectations. We abandoned it because it was just too brittle, especially in field fabrication.

“By combining Ingeo, PETG and some recycled content, we arrived at a much-more-durable formula,” Alan said. He went on to say InPro’s G2 Blend biopolymer products continue to rack up impressive sales numbers. “We keep having to move the sales target for the biopolymer products because the market is buying well ahead of our projections. I’ll gladly do that math.”

Like NatureWorks and Eastman Chemical, InPro is staying in the lab, and pushing R&D to reach beyond past-generation plastics. “The market wants to know we’re doing our part to take material science to the next level, and then the one beyond that,” Alan said. “R&D can often take us out into unexplored territory, but that’s what innovation is all about.” +

Related Stories

| Aug 20, 2012

Protecting the artifacts at George H.W. Bush Presidential Library and Museum

Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.

| Aug 17, 2012

Ferreri joins PGAL as Principal

Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.

| Aug 17, 2012

Centric Architecture and PLAD Studio merge

The new firm will retain Centric Architecture as its name.

| Aug 15, 2012

MBH Architects announces new appointments

MBH Architects continues to grow, take on new clients.

| Aug 15, 2012

Architects and designers challenged in Allsteel’s reality design competition

KITS mobile app offers flexibility in planning.

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

| Aug 14, 2012

SOM Foundation announces prize recipients for 2012

Submissions for the SOM Prize were received from students at 34 schools in the U.S.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

DSGW Architects welcomes new employees

Three new employees located in DSGW's Duluth office.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021