flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

InPro’s bio-content becomes Cradle-to-Cradle CertifiedCM Silver

InPro’s bio-content becomes Cradle-to-Cradle CertifiedCM Silver

Two main components of G2 Blend formula now C2C Certified Silver.


By Posted by Tim Gregorski, Senior Editor | June 15, 2012

The biopolymer component of InPro’s revolutionary G2 Blend formula has just become Cradle to Cradle CertifiedCM Silver from Cradle to Cradle Products Innovation Institute. McDonough Braungart Design Chemistry (MBDC) has licensed the certification mark along with the Cradle to Cradle protocols to the Institute, which is responsible for certifying products.

NatureWorks’ Ingeo biopolymer, made from plants, not oil, is the first product of its kind to become Cradle to Cradle Certified Silver. InPro combines Ingeo with Eastman Chemical’s PETG, which also holds a C2C Silver certificate. InPro’s formula also contains recycled content. All three components give G2 Blend significant impact resistance for its interior protection products.

“With G2 Blend, we wanted to completely revolutionize interior protection products, and we were the first to step beyond traditional polymers,” said Mark Alan, senior vice president of product management and development at InPro. “We had toyed with plain PETG for six years, but it didn’t live up to our performance expectations. We abandoned it because it was just too brittle, especially in field fabrication.

“By combining Ingeo, PETG and some recycled content, we arrived at a much-more-durable formula,” Alan said. He went on to say InPro’s G2 Blend biopolymer products continue to rack up impressive sales numbers. “We keep having to move the sales target for the biopolymer products because the market is buying well ahead of our projections. I’ll gladly do that math.”

Like NatureWorks and Eastman Chemical, InPro is staying in the lab, and pushing R&D to reach beyond past-generation plastics. “The market wants to know we’re doing our part to take material science to the next level, and then the one beyond that,” Alan said. “R&D can often take us out into unexplored territory, but that’s what innovation is all about.” +

Related Stories

| Sep 30, 2014

The Big Room concept: Using Building Team collocation to ensure project success

Implementing collocation via the Big Room concept will remove silos, ensure a cadence for daily communication, promote collaboration, and elevate your chances for success, write CBRE Healthcare's Stephen Powell and Magnus Nilsson.

| Sep 30, 2014

USGBC, Bank of America name recipients of 2014 Affordable Green Neighborhoods Grant Program

Eleven projects have been selected for the 2014 Affordable Green Neighborhoods grant program. Each will receive $31,000 and an educational package to support their pursuit of LEED for Neighborhood Development certification.

Sponsored | | Sep 30, 2014

What are you doing to win business and improve morale?? VDC Director Kris Lengieza shares ways to do both

Bluebeam's Sasha Reed sits down with Kris Lengieza, Director of Virtual Design and Construction for Stiles Corporation, to learn how he approaches change management. SPONSORED CONTENT

Sponsored | | Sep 30, 2014

How project managers can manage technology

Not long ago, the role of a construction project manager revolved around working with people: employees, vendors, consultants, designers, subcontractors and owners. Today, project managers primarily manage information. SPONSORED CONTENT

| Sep 30, 2014

With its 'stacked volumes' scheme, 3XN wins bid to design high-rise in Sydney

By dividing the 200-meter building into five separate volumes and placing atria throughout each volume, the spaces become smaller, more intimate social environments, according to the Danish architects.

| Sep 29, 2014

Living Building vs. LEED Platinum: Comparing the first costs and savings

Skanska USA's Steve Clem breaks down the costs and benefits of various ultra-green building standards and practices.

| Sep 29, 2014

10 common deficiencies in aging healthcare facilities

VOA's Douglas King pinpoints the top issues that arise during healthcare facilities assessments, including missing fire/smoke dampers, out-of-place fire alarms, and poorly constructed doorways. 

| Sep 29, 2014

Snøhetta releases final plan for terraced central library in Calgary

The competition-winning New Central Library is now in the final design stages, after two years of community engagement on the part of design firms Snøhetta and DIALOG. 

| Sep 25, 2014

Jean Nouvel unveils plans for National Art Museum of China

Of the design, Nouvel describes it as inspired by the simplicity of “a single brush stroke.” 

Sponsored | | Sep 25, 2014

Your business doesn’t always need to change

By now, the idea that organizations must adapt to maintain both relevance and market share is so ingrained that it’s been reduced to pithy sayings. But is constant adaptation always the best policy? SPONSORED CONTENT

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021