flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Initial work on mixed-use development, The Parks at Walter Reed, is underway

Mixed-Use

Initial work on mixed-use development, The Parks at Walter Reed, is underway

The D.C. development is the product of a partnership between Hines, Urban Atlantic, and Triden Development Group.


By David Malone, Associate Editor | December 1, 2016

Work has begun on the 66-acre The Parks at Walter Reed mixed-use development in Washington, D.C. The project is being constructed at the site of the former Walter Reed Army Medical Center and, when completed, will total over 3.1 million sf of new construction and adaptive reuse.

The site was freed up for the project in 2005 when the U.S. Army vacated the base as a result of the Base Realignment and Closure Act and moved to the former National Naval Medical Center in Bethesda, Md.

Over the next 10 to 15 years, The Parks at Walter Reed will undergo multiple phases of construction resulting in the creation of the following:

 

  • Over 2,100 units of rental and for-sale housing, 431 of which will be designated as affordable;
  • 230,000-250,000 sf of grocery-anchored retail;
  • 185,000 sf of office space;
  • A 200-key hotel and conference center;
  • 30,000 sf of arts and cultural uses;
  • 116,000 sf of ambulatory medical care provided by Howard University Hospital;
  • Two language immersion charter schools (one middle-high school and one elementary school);
  • Almost 20 acres of open space, parks, and plazas.

 

The District of Columbia selected Hines, Urban Atlantic, and Triden Development Group as master planner with Weingarten Realty Trust and Toll Brothers also on the development team as component developers.

Initial infrastructure work and the demolition of an existing 2.6 million-sf hospital will begin in 2017.

Tags

Related Stories

Affordable Housing | Feb 15, 2023

2023 affordable housing roundup: 20+ multifamily projects

In our latest call for entries, Building Design+Construction collected over 20 multifamily projects with a focus on affordable housing. Here is a comprehensive list of all projects in alphabetical order.

Multifamily Housing | Feb 11, 2023

8 Gold and Platinum multifamily projects from the NAHB's BALA Awards

This year's top BALA multifamily winners showcase leading design trends, judged by eight industry professionals from across the country.

Multifamily Housing | Feb 10, 2023

Dallas to get a 19-story, 351-unit residential high-rise

In Dallas, work has begun on a new multifamily high-rise called The Oliver. The 19-story, 351-unit apartment building will be located within The Central, a 27-acre mixed-use development near the Knox/Henderson neighborhood north of downtown Dallas. 

Mixed-Use | Dec 7, 2022

Bjarke Ingels’ first design project in South America is poised to open next year in Ecuador

In 2013, Quito, Ecuador’s capital, opened its new airport, which had been relocated from the metro’s center to an agricultural site 12 miles northeast of the city. Since then, Quito’s skyline has been reshaped by new, vertical structures that include the 24-story mixed-use EPIQ Residences, designed in the shape of a quarter circle by Bjarke Ingels Group (BIG).

High-rise Construction | Dec 7, 2022

SOM reveals its design for Singapore’s tallest skyscraper

Skidmore, Owings & Merrill (SOM) has revealed its design for 8 Shenton Way—a mixed-use tower that will stand 63 stories and 305 meters (1,000 feet) high, becoming Singapore’s tallest skyscraper. The design team also plans to make the building one of Asia’s most sustainable skyscrapers. The tower incorporates post-pandemic design features.

Office Buildings | Dec 6, 2022

‘Chicago’s healthiest office tower’ achieves LEED Gold, WELL Platinum, and WiredScore Platinum

Goettsch Partners (GP) recently completed 320 South Canal, billed as “Chicago’s healthiest office tower,” according to the architecture firm. Located across the street from Chicago Union Station and close to major expressways, the 51-story tower totals 1,740,000 sf. It includes a conference center, fitness center, restaurant, to-go market, branch bank, and a cocktail lounge in an adjacent structure, as well as parking for 324 cars/electric vehicles and 114 bicycles.

Mixed-Use | Dec 6, 2022

Houston developer plans to convert Kevin Roche-designed ConocoPhillips HQ to mixed-use destination

Houston-based Midway, a real estate investment, development, and management firm, plans to redevelop the former ConocoPhillips corporate headquarters site into a mixed-use destination called Watermark District at Woodcreek.

Data Centers | Nov 28, 2022

Data centers are a hot market—don't waste the heat!

SmithGroup's Brian Rener shares a few ways to integrate data centers in mixed-use sites, utilizing waste heat to optimize the energy demands of the buildings.

Mixed-Use | Oct 20, 2022

ROI on resilient multifamily construction can be as high as 72%

A new study that measured the economic value of using FORTIFIED Multifamily, a voluntary beyond-code construction and re-roofing method developed by the Insurance Institute for Business & Home Safety (IBHS), found the return can be as high as 72%.

Mixed-Use | Oct 18, 2022

Mixed-use San Diego tower inspired by coastal experience and luxury travel

The new 525 Olive mixed use San Diego tower was inspired by the coastal experience and luxury travel.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021