Last month, the demolition of a dilapidated warehouse/factory in Metuchen, N.J., commenced to make way for an apartment complex with 272 Class A studio, one-, two-, and three-bedroom units.
The multifamily community redevelopment is being spearheaded by Klein Enterprises, a 75-year-old firm with nearly 60 assets in its portfolio. Last year, Klein acquired the Gulton factory as part of the development parcel that is adjacent to a 30-acre wildlife preserve. It made that acquisition under the PILOT incentive program, which allows the developer to make payments to the borough in lieu of taxes based on the project’s revenue. Over the 30-year agreement, it is estimated that Klein Enterprises will pay $20 million. The borough would receive 95 percent of the PILOT revenue.
This project will provide Metuchen—a bedroom community that’s a 45-minute train ride from New York City—with millions of dollars to invest in infrastructure. Prior to the start of the factory demolition, the property had already undergone a $10 million environmental remediation that included the planting of 3,000 trees. (The land is bounded on the west by a borough-owned woodland within the wildlife preserve, which will receive $1 million of Klein’s PILOT payments earmarked for improvements that include a network of trails and paths, more open space, and access and parking for a new nature preserve.)
A solution after years of discussion
The apartment complex is expected to take 24 months to complete by the fall of 2025. Fifteen percent of the units will meet New Jersey’s affordable housing requirements. Six of the apartments, all on the ground floor, will be one-bedroom live-work homes.
The community’s interior design will honor artists, literary figures, and intellectuals who brought culture and the arts to Metuchen in the 1800s. The project is also pursuing green initiatives that include a partial green roof, large solar array, electric car charging stations, LED lighting, and a pollinator garden. Other amenities will include a dog park, pool, and community garden.
The site of the apartment complex is located at 212 Durham Avenue. Metuchen Realty Advisors, which acquired the land in 1986 and did the environmental cleanup, sold a piece of the land to Middlesex County, and will transfer the remaining open space after the community is completed. This land is adjacent to the planned expansion of the popular Middlesex County Greenway linear park.
Metuchen Mayor Jonathan M. Busch was quoted as stating that discussions about how to redevelop this industrial site had been ongoing for decades. (The Borough designated the Gulton property as an area in need of development in 2015.) The redevelopment, he stated, “enable[s] us to open the largest recreational space in Metuchen, fund a variety of important infrastructure projects, and help protect our environment, all while providing our community with new housing options.”
The apartment complex is located near Metuchen’s train station, and will be within walking distance to the borough’s downtown.
Related Stories
| May 2, 2014
Norwegian modular project set to be world's tallest timber-frame apartment building [slideshow]
A 14-story luxury apartment block in central Bergen, Norway, will be the world's tallest timber-framed multifamily project, at 49 meters (160 feet).
| May 1, 2014
Tight on space for multifamily? Check out this modular kitchen tower
The Clei Ecooking kitchen, recently rolled out at Milan's Salone de Mobile furniture fair, squeezes multiple appliances into a tiny footprint.
| Apr 30, 2014
Visiting Beijing's massive Chaoyang Park Plaza will be like 'moving through a urban forest'
Construction work has begun on the 120,000-sm mixed-use development, which was envisioned by MAD architects as a modern, urban forest.
| Apr 29, 2014
Best of Canada: 12 projects nab nation's top architectural prize [slideshow]
The conversion of a Mies van der Rohe-designed gas station and North Vancouver City Hall are among the recently completed projects to win the 2014 Governor General's Medal in Architecture.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 23, 2014
Developers change gears at Atlantic Yards after high-rise modular proves difficult
At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.
| Apr 17, 2014
Online mapping tool helps teams determine multifamily project tax credit eligibility
Accounting and advisory firm Baker Tilly has launched a new, interactive online mapping tool that helps users determine if a business or development project may qualify for the New Markets Tax Credit or Low-Income Housing Tax Credit program.
| Apr 11, 2014
ULI report documents business case for building healthy projects
Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.