flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Increased backlogs, margins lead to renewed optimism in global construction

Increased backlogs, margins lead to renewed optimism in global construction

KMPG survey indicates a high level of optimism among international AEC execs.


By KPMG International | October 29, 2013

After prolonged economic uncertainty, a majority of executives in the global engineering and construction sector have fresh confidence in the growth prospects for the industry, according to KPMG International's 2013 Global Construction Survey.

A general increase in backlogs and margins is giving cause for optimism across the industry, with further growth anticipated. Just over 50 percent of 165 C-level executives from the Americas; Europe, Middle East and Africa (EMEA); and Asia-Pacific (AsPac) regions said their companies experienced an increase in backlogs of at least 5 percent from 2012 to 2013. Moreover, though margins are not rising at the same rate as backlogs, 80 percent said their margins will either remain stable or increase more than 2 percent in the same period.

The Americas region had the highest confidence for growth with 90 percent forecasting margins as stable or increasing by more than 2 percent. By contrast, 28 percent of companies in the AsPac region see margins decreasing by fewer than 2 percent.

"Our 2013 survey shows the overall outlook in the industry is directionally positive," said Geno Armstrong, global leader of KPMG's Engineering and Construction practice. "A higher level of confidence in the Americas, demonstrated by large margin growth, is an indication of greater efficiency and cost management."

Looking at growth forecasts for 2013, optimism pervades with 64 percent expecting growth up to 25 percent. The highest growth is expected in Central and South America, and Africa. KPMG's Armstrong attributes the growth to "favorable trading conditions in the regions, as well as good prospects for mining, oil and natural gas." And, overall, companies with revenues greater than US$5 billion see the greatest potential for growth.

Drivers and Barriers to Growth
Government infrastructure plans (66 percent) were most frequently cited as the leading driver for growth, followed by global economic growth (42 percent) and population growth (38 percent).

In the Americas, privatization efforts via public-private partnerships (48 percent) and access to new energy sources such as natural gas or renewables (42 percent) ranked as the leading drivers for growth behind government infrastructure plans (58 percent).

Even with resurging optimism, many companies maintain a balanced view on what the likely obstacles to growth might be, with budget deficits and public funding shortages being the overwhelming factor, according to 72 percent of executives. Private-sector financing (43 percent) ranked second among respondents.

As companies ramp up for growth, a near consensus (93 percent) said that their risk management programs have improved project performance. Yet, more than three-quarters of respondents said the underlying causes of underperforming projects were project delays, poor estimating practices and failed risk management processes.

Expansion Plans -- New Geographies and Sectors
In anticipation of continued growth, 47 percent of respondents said their companies are making plans for international expansion into new regions. Africa (35 percent), U.S./Canada (28 percent), and the Middle East (22 percent) are the leading regional targets for expansion. Entering new sub-sectors of the industry is also in the works for 44 percent of respondents, with the power sector (54 percent), water-related activities (28 percent), and mining (27 percent) the leading areas for planned investment.

"The power sector is, without question, presently attracting the most interest," said Armstrong. "With the increase in economic activity and the hyper-focus on energy security, it stands to reason that many players will see opportunity in this area. Power, as well as water, mining, and other resources will increasingly become a critical priority of the business agenda in this industry."

About the KPMG Survey
The survey was conducted in early 2013 through face-to-face interviews with 165 senior leaders -- many of them Chief Executive Officers -- from leading engineering and construction companies in 29 countries worldwide. Respondent representation was spread across the Americas (20 percent), EMEA (52 percent), and AsPac (28 percent).

About KPMG LLP
KPMG LLP, the audit, tax and advisory firm (www.kpmg.com/us), is the U.S. member firm of KPMG International Cooperative ("KPMG International"). KPMG International's member firms have 152,000 professionals, including more than 8,600 partners, in 156 countries.

Related Stories

| Feb 11, 2011

Research facility separates but also connects lab spaces

California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.

| Feb 11, 2011

A feast of dining options at University of Colorado community center, but hold the buffalo stew

The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.

| Feb 11, 2011

Chicago high-rise mixes condos with classrooms for Art Institute students

The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.

| Feb 11, 2011

Iowa surgery center addresses both inpatient and outpatient care

The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.

| Feb 11, 2011

Grocery store anchors shopping center in Miami arts/entertainment district

18Biscayne is a 57,200-sf urban retail center being developed in downtown Miami by commercial real estate firm Stiles. Construction on the three-story center is being fast-tracked for completion in early 2012. The project is anchored by a 49,200-sf Publix market with bakery, pharmacy, and café with outdoor seating. An additional 8,000 sf of retail space will front Biscayne Boulevard. The complex is in close proximity to the Adrienne Arsht Center for the Performing Arts, the downtown Miami entertainment district, and the Omni neighborhood, one of the city’s fast-growing residential areas.

| Feb 11, 2011

Chicago architecture firm planning one of China’s tallest towers

Chicago-based Goettsch Partners was commissioned by developer Guangzhou R&F Properties Co. Ltd. to design a new 294,570-sm mixed-use tower in Tianjin, China. The Tianjin R&F Guangdong Tower will be located within the city’s newly planned business district, and at 439 meters it will be one of China’s tallest buildings. The massive complex will feature 134,900 sm of Class A office space, a 400-key, five-star hotel, 55 condominiums, and 8,550 sm of retail space. The architects are designing the tower with multi-story atriums and a high-performance curtain wall to bring daylight deep into the building, thereby creating deeper lease spans. The project is currently finishing design.

| Feb 11, 2011

Two projects seek to reinvigorate Los Angeles County medical center

HMC Architects designed two new buildings for the Los Angeles County Martin Luther King, Jr., Medical Center as part of a $360 million plan to reinvigorate the campus. The buildings include a 120-bed hospital, which involves renovation of an existing tower and several support buildings, and the construction of a new multi-service ambulatory care center. The new facilities will have large expanses of glass at all waiting and public areas for unobstructed views of downtown Los Angeles. A curved glass entrance canopy will unite the two buildings. When both projects are completed—the hospital in 2012 and the ambulatory care center in 2013—the campus will have added more than 460,000 sf of space. The hospital will seek LEED certification, while the ambulatory care center is targeting LEED Silver.

| Feb 11, 2011

Sustainable community center to serve Angelinos in need

Harbor Interfaith Services, a nonprofit serving the homeless and working poor in the Harbor Area and South Bay communities of Los Angeles, engaged Withee Malcolm Architects to design a new 15,000-sf family resource center. The architects, who are working pro bono for the initial phase, created a family-centered design that consolidates all programs into a single building. The new three-story space will house a resource center, food pantry, nursery and pre-school, and administrative offices, plus indoor and outdoor play spaces and underground parking. The building’s scale and setbacks will help it blend with its residential neighbors, while its low-flow fixtures, low-VOC and recycled materials, and energy-efficient mechanical equipment and appliances will help it earn LEED certification.

| Feb 11, 2011

Texas megachurch inspired by yesteryear’s materials, today’s design vocabulary

The third phase of The First Baptist Church of Pasadena, Texas, involves construction of a new 115,000-sf worship center addition. Currently in design by Zeigler Cooper, the project will include a 2,500-seat worship center (with circular layout and space for a 50-person orchestra and 200-person choir), a 500-seat chapel (for weddings, funerals, and special events), and a prayer room. The addition will connect to the existing church and create a Christian Commons for education, administration, music, and fellowship. The church asked for a modern design that uses traditional materials, such as stone, brick, and stained glass. Construction is scheduled to begin this summer.

| Feb 11, 2011

Apartment complex caters to University of Minnesota students

Twin Cities firm Elness Swenson Graham Architects designed the new Stadium Village Flats, in the University of Minnesota’s East Bank Campus, with students in mind. The $30 million, six-story residential/retail complex will include 120 furnished apartments with fitness rooms and lounges on each floor. More than 5,000 sf of first-floor retail space and two levels of below-ground parking will complete the complex. Opus AE Group Inc., based in Minneapolis, will provide structural engineering services.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021