IMEG Corp., a leading full-service engineering firm, has acquired the structural engineering group of Cardno. Â Â
Founded in Houston in 1976 as Haynes Whaley, the structural group joined Cardno, a publicly traded global engineering and environmental consulting firm, in October 2013. The team specializes in structural design and forensic engineering in a variety of market sectors. Its offices in Reston, VA, and Houston and Austin, TX, add to the reach of IMEG’s previously existing 50 offices.
"We are excited to add Cardno’s structural team and deepen our bench of expertise," said IMEG President/CEO Paul VanDuyne. “Their strong and diverse client base is a testament to their technical skills and customer-based focus – two vital characteristics that match IMEG’s own priorities.” VanDuyne added that the team’s structural capabilities complement IMEG’s existing MEP capabilities in the Texas region and the Reston office is a great first step in expanding east. “This enables us to now offer full engineering building design services in the Texas marketplace and positions IMEG for future growth,” he said.
Bob Pronier, Principal and team leader, said his team is looking forward to being part of IMEG’s growing national presence and breadth of disciplines. “By combining both firms’ structural building expertise, along with IMEG’s building design experience in multiple national markets, we’re creating a strong synergy for future growth,” he said. “This acquisition also enhances the expertise and value we bring to our clients.” Bob will continue to lead the Reston, Houston, and Austin operations.
The team joined IMEG on May 29 and is now doing business as IMEG Corp. It will continue to operate out of its existing locations with the same team and leadership continuity. AEC Advisors, LLC initiated the transaction and advised Cardno.
Related Stories
| Feb 6, 2012
FMI releases 2012 Construction Productivity Report
Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.
| Feb 6, 2012
Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum
EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.
| Feb 6, 2012
Batson-Cook announces the appointment of Hall as president
Hall will manage and direct all aspects of the firm’s day-to-day operations. He will be based in Batson-Cook’s Atlanta office.
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.Â
| Feb 2, 2012
VLK Architects selected for new Cypress, Texas elementary school
The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Feb 2, 2012
Delk joins Gilbane Building Co.
Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.