IMEG Corp., a leading full-service engineering firm, has acquired the structural engineering group of Cardno.
Founded in Houston in 1976 as Haynes Whaley, the structural group joined Cardno, a publicly traded global engineering and environmental consulting firm, in October 2013. The team specializes in structural design and forensic engineering in a variety of market sectors. Its offices in Reston, VA, and Houston and Austin, TX, add to the reach of IMEG’s previously existing 50 offices.
"We are excited to add Cardno’s structural team and deepen our bench of expertise," said IMEG President/CEO Paul VanDuyne. “Their strong and diverse client base is a testament to their technical skills and customer-based focus – two vital characteristics that match IMEG’s own priorities.” VanDuyne added that the team’s structural capabilities complement IMEG’s existing MEP capabilities in the Texas region and the Reston office is a great first step in expanding east. “This enables us to now offer full engineering building design services in the Texas marketplace and positions IMEG for future growth,” he said.
Bob Pronier, Principal and team leader, said his team is looking forward to being part of IMEG’s growing national presence and breadth of disciplines. “By combining both firms’ structural building expertise, along with IMEG’s building design experience in multiple national markets, we’re creating a strong synergy for future growth,” he said. “This acquisition also enhances the expertise and value we bring to our clients.” Bob will continue to lead the Reston, Houston, and Austin operations.
The team joined IMEG on May 29 and is now doing business as IMEG Corp. It will continue to operate out of its existing locations with the same team and leadership continuity. AEC Advisors, LLC initiated the transaction and advised Cardno.
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.