flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ICC release 2019 guidelines for safe use of repurposed shipping containers

Codes and Standards

ICC release 2019 guidelines for safe use of repurposed shipping containers

Provides in-depth, technical overview on how to design, review, and approve shipping containers as building elements.


By Peter Fabris, Contributing Editor | March 25, 2019

Courtesy Pixabay

The International Code Council released the 2019 guideline for the safe use of repurposed shipping containers.

Guideline for the Safe Use of ISO Intermodal Shipping Containers Repurposed as Buildings and Building Components provides an in-depth, technical overview for how to design, review, and approve intermodal shipping containers as building elements. It is intended to benefit state and local jurisdictions, owners, architects, builders, and engineers.

There is currently a lack of regulatory and compliance guidelines pertaining to the growing trend of shipping container repurposing. “The new guideline will provide communities with the tools they need to ensure that repurposed shipping containers are used in a safe and responsible manner,” said Code Council CEO Dominic Sims.

The Code Council also announced that it is accepting applications for its Off-Site and Modular Construction Standard Consensus Committee as it prepares developing two new comprehensive standards. The committee will develop two new off-site and modular construction standards: Planning, Design, Fabrication and Assembly; and Inspection and Regulatory Compliance.

Related Stories

Codes and Standards | Jun 27, 2018

Thirty nine San Francisco high rises at risk of collapse in major earthquake

Vulnerable buildings have welded columns and beams.

Codes and Standards | Jun 26, 2018

Boston enacts new climate resiliency rules for buildings

New policy is likely a first in the nation.

Codes and Standards | Jun 25, 2018

Integrated Project Delivery guide offered by Pankow Foundation

An Action Guide for Leaders offers answers to critical IPD questions.

Codes and Standards | Jun 21, 2018

New app said to automate code compliance

Startup offers plug-in that scans 3D models.

Codes and Standards | Jun 20, 2018

Home values and local tax revenues at risk from high tide flooding, scientists group says

Analysis of property data identifies communities prone to frequent flooding.

Codes and Standards | Jun 19, 2018

Structural engineered wood products exempt from new EPA formaldehyde ruling

Exempt products include structural plywood, oriented strand board (OSB).

Codes and Standards | Jun 18, 2018

Seattle City Council repeals controversial new per-worker tax on large employers

Measure was aimed at raising $50 million for homeless services, affordable housing.

Codes and Standards | Jun 14, 2018

Hardscape from development makes ‘1,000-year’ flood in Maryland worse

Impermeable concrete made it easier for water to overwhelm drainage system.

Codes and Standards | Jun 13, 2018

United States Resiliency Council announces support for Calif. earthquake resiliency bill

Measure would help cities identify structures that could fail in major quake.

Codes and Standards | Jun 12, 2018

Congestion pricing for cars is effective in reducing traffic, but a difficult sell

After three years, traffic congestion declined by 30% in London.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021