As The International Code Council prepares for a vote on new code provisions that would allow wood-framed structures up to 18 stories high, concerns and opposition are still strong.
For instance, the Portland Cement Association (PCA) sponsored an online survey resulting in 75% of respondents saying they did not believe raising the allowable height of wood buildings was prudent. Their reasons included concerns over the strength and maintainability of wood, the danger of fire, and vulnerability to disasters.
Some members of the ICC's Ad Hoc Committee on Tall Wood Buildings shared some of those concerns. Proponents of wood-framed high rises point to research indicating that charring of heavy timber allows wood structures to maintain up to 90% of their strength during a fire.
Oregon recently became the first state to enact codes for high-rise, wood-framed buildings. The ICC will hold a public comment hearing on the issue after its annual conference in October. Later, online voting on the new code provision will be held over two weeks.
Related Stories
Codes and Standards | May 23, 2018
AAMA releases 2017/2018 fenestration market studies
Offers forecasts of industry trends.
Codes and Standards | May 22, 2018
Registration open for 2018 National Energy Codes Conference
U.S. Department of Energy event to be held July 15th-17th in Austin.
Codes and Standards | May 21, 2018
New standard tests quietness of floors
ASTM International method will help manufacturers test their flooring materials.
Codes and Standards | May 17, 2018
California will require solar panels on most new homes
Projected to add $10,000 to cost of new homes.
Codes and Standards | May 16, 2018
New resources offer tips on off-site construction
NIBS documents address using pre-cast concrete, and commercial and legal considerations of modular construction.
Codes and Standards | May 15, 2018
Blast testing of loaded mass timber structures yields positive results
Four tests covered a spectrum of blast loads.
Codes and Standards | May 14, 2018
Maryland makes general contractors liable for failure of subs to pay employees
GCs could have to pay for up to three times the wages owed.
Codes and Standards | May 10, 2018
Data collection, machine learning boost building efficiency
Sensors, software algorithms squeeze out waste.
Codes and Standards | May 9, 2018
OSHA and state safety agencies write more than 100 silica citations in 6 months
Actions tending to come with investigation of other site conditions.
Codes and Standards | May 8, 2018
Powerhouse coalition builds energy positive buildings
The goal: build buildings that provide more power than they cost to build, run, and demolish.