flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ICC eliminates building electrification provisions from 2024 update

Codes and Standards

ICC eliminates building electrification provisions from 2024 update

Unexpected move provokes controversy in codes development process


By Peter Fabris, Contributing Editor | April 12, 2024
Image by Mircea Iancu from Pixabay - ICC eliminates building electrification provisions from 2024 update

Image by Mircea Iancu from Pixabay

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

The update would have made it more economical for building owners to install solar panels, induction stoves, and heat pumps. Instead, if a building is constructed to the code’s watered-down standards, the owner faces a costly upgrade to electrify the property.

The ICC’s appeals board had rejected challenges by the natural gas industry to the proposed electrification provisions. But, the ICC’s board of directors, which typically goes along with its appeals board’s recommendations, overruled the decision. Although the building electrification components will be included in the optional appendix section of the codebook, widespread adoption of more robust circuitry is unlikely without a mandate.

The ICC board has received sharp criticism from energy efficiency advocates for its action, with some accusing the board of allowing fossil fuel interests too much sway in the code development process.

Related Stories

Codes and Standards | Jan 26, 2022

Downtown digital twin to aid Las Vegas in setting policy priorities

Will be used to address energy use, emissions, traffic, parking, noise, and emergency management.

Codes and Standards | Jan 25, 2022

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.

Codes and Standards | Jan 25, 2022

Critics slam proposed revamp of California’s solar net energy metering rate

Could make rooftop solar panels unaffordable for most customers.

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

Codes and Standards | Jan 24, 2022

N.Y. governor calls for ban on natural gas in new buildings

Action follows New York City’s ban.

Codes and Standards | Jan 19, 2022

EPA may expand product lineup that can earn WaterSense label

Would include systems that enhance water quality at the tap.

Codes and Standards | Jan 19, 2022

Canada’s Trudeau seeking building codes changes, net-zero emissions building strategy

Prime minister also wants net-zero electricity grid by 2035.

Codes and Standards | Jan 18, 2022

Greater emphasis on building materials needed to achieve net-zero carbon offices

Engineered wood, straw, and bamboo can be keys to achieving goal.

Codes and Standards | Jan 17, 2022

AISC seeks comments on draft earthquake standard for steel buildings

Includes new limits for cross-sectional slenderness of steel columns based on latest research.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021