flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HWKN unveils Bushwick Generator office campus

Office Buildings

HWKN unveils Bushwick Generator office campus

The building will become a new hub for innovative companies in Brooklyn.


By David Malone, Associate Editor | November 9, 2020
Bushwick Generator office campus

All images: Viewpoint Studios

HWKN has unveiled Bushwick Generator, a new office campus meant to embody the Brooklyn neighborhood’s energy and tradition of disruptive entrepreneurship.

As part of the campus’ design, the light-industrial buildings that existed on site were reimagined as part of the new building’s foundation. Atop this base, HWKN designed a brick-clad, sculptural, gem-like volume that introduces a vertical focal point in the neighborhood and comprises 400,000-sf of workspace.

 

Bushwick Generator from the street

 

In order to create working environments that reflect the lively, unique exterior form, the design invites the surrounding neighborhood’s energy inside with areas for public programming. These spaces can be used for exhibitions, performances, and social events, bringing together office tenants with community members in a bustling center that offers something to tenants and Bushwick locals alike. 

To further open the building to the street, a corner of the existing light-industrial structures is sliced off at the base, creating a triangular entrance that continues the faceted geometry to the ground plane and carves out space for a sidewalk plaza. Above this, a landscaped outdoor terrace activates the area where the rectangular base meets the vertical gem. This unique amenity can serve as a breakout space, an informal meeting area, or a venue for public events.

 

Bushwick Generator

 

The octagonal floor-plates can be flexibly subdivided, allowing the building to host businesses ranging from start-ups and growth-phase companies to established industry leaders. The building’s form creates distinctive interior work environments with 270-degrees of exposure, flooding each floor with natural daylight and panoramic views of Brooklyn and Manhattan.

The campus is slated for completion in 2023. The build team includes HWKN (design architect), Land Collective (landscape design), Salamon Engineering Group (MEP), Philip Habib & Associates (civil engineer), and Titan Engineers (structural engineer).

 

Bushwick Generator outdoor public space

 

Related Stories

Office Buildings | Feb 24, 2017

The sun’s rays helped shape this Studio Gang-designed NYC tower

Solar Carve Tower advances Studio Gang’s ‘solar carving’ design strategy.

Office Buildings | Feb 16, 2017

Bjarke Ingels Group wins competition to design S.Pellegrino Flagship Factory

The factory will immerse employees and visitors in nature from all sides.

Industry Research | Feb 15, 2017

Putting workers first should be every employer’s priority

The latest Sodexo report on workplace trends explores 10 factors that are impacting the global work environment.   

Office Buildings | Feb 8, 2017

London office building employs transitional forms to mediate between the varied heights of surrounding buildings

Friars Bridge Court will provide a transition between the unvarying height of the buildings to the south and the more varied heights of the northern buildings.

Office Buildings | Feb 7, 2017

SOM-designed HQ will provide new riverfront space for C.H. Robinson

Over 1,000 employees will work in the HQ building when completed.

Office Buildings | Feb 6, 2017

The see-through office: Why interior glass is all the rage in workplace design

The hottest material in workplace design—interior glass—opens offices to light and collaboration. But what about privacy and acoustics?

Office Buildings | Feb 3, 2017

Zurich defies center-core office archetype with stacked, cantilevered HQ

The top bar is 500 feet long, spans 180 feet between the bottom two bars, and cantilevers out 60 feet to the east.

Office Buildings | Feb 2, 2017

3 tips for designing workplaces that support culture, brand, and community

An authentic culture cannot be forced, but can be encouraged and supported.

Office Buildings | Dec 14, 2016

The importance of 'Place' in the workplace

More, and more, companies are emphasizing the importance of creating a meaningful sense of place in the office environment for all of their employees, writes Gensler's Kevin Rosenstein.

High-rise Construction | Dec 13, 2016

The tallest building in Manhattan’s Meatpacking district tops out

The office, designed by CetraRuddy, will be completed in 2017.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021