flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hurricane Ian aftermath expected to prompt building code reform in Florida

Codes and Standards

Hurricane Ian aftermath expected to prompt building code reform in Florida

Elevated living spaces and the move from wood to concrete block framing are possible solutions. 


By Peter Fabris, Contributing Editor | May 1, 2023
Hurricane Ian aftermath expected to prompt building code reform in Florida
Image by WikiImages from Pixabay

Hurricane Ian struck the Southwest Florida coastline last fall with winds exceeding 150 mph, flooding cities, and devastating structures across the state.

A construction risk management expert writing for Multifamily Dive believes the projected economic damage, as high as $75 billion, will prompt the state to beef up building codes and reform land use rules. Changes may include higher elevations requirements, elevated living spaces, and mandates for concrete block framing.

Single-family and multifamily homes anchored on concrete piers may be designed with open garages to protect elevated living spaces. Building pad elevations are likely to rise.

Nearly 500,000 insurance claims have already been filed in the aftermath of Ian, with estimated losses of $4.5 billion, according to the Florida Office of Regulation. Thousands of residents are still waiting to rebuild destroyed homes.

Improved codes and regulations that yield more resilient structures will help ensure that the state will better withstand the impact of future mega-storms like Ian that are likely to strike the state again. Florida officials appear to be getting that message.

Related Stories

| Dec 15, 2011

NRDC charges Maine governor with weakening green wood requirement

The FSC program is administered through the Leadership in Energy and Environmental Design (LEED) and requires wood to be harvested in a sustainable way.

| Dec 15, 2011

Post-tornado, Tuscaloosa seeks to create walkable urban, retail areas

Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet.

| Dec 15, 2011

Allentown, Pa. city council asked to repeal union-friendly law

The mayor of Allentown, Pa. asked the City Council to repeal a year-old ordinance that forces contractors to hire union workers for large city projects funded with state and federal dollars.

| Dec 13, 2011

LEED-EB outpaces LEED for new construction

The U.S. Green Building Council's (USGBC's) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 13, 2011

Regulators charge pervasive abuse of construction workers in Connecticut

Federal and state regulators say they have uncovered what they call "widespread noncompliance" with minimum wage and overtime laws in Connecticut's construction industry.

| Dec 13, 2011

Philadelphia mayor signs order for project labor agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

| Dec 13, 2011

Improved code requirements for attic ventilation

The Roof Assembly Ventilation Coalition (RAVC) participated in the development of the code.

| Dec 12, 2011

LEED-EB Outpaces LEED for New Construction

The U.S. Green Building Council’s (USGBC’s) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 12, 2011

Philadelphia Mayor Signs Order for Project Labor Agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

| Dec 12, 2011

Improved Code Requirements for Attic Ventilation

The International Code Council (ICC) recently published the 2012 International Residential Code (IRC) that includes improved code requirements for balanced intake and exhaust for ventilated attics.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021