flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

How to prevent corrosion in sprinkler system piping

Codes and Standards

How to prevent corrosion in sprinkler system piping

The technical committees responsible for NFPA 13, Installation of Sprinkler Systems, have been looking at ways to eliminate or reduce corrosion in sprinkler systems for several revision cycles.


By Peter Fabris, Contributing Editor | June 18, 2015
How to prevent corrosion in sprinkler system piping

Image: Pixabay

Corrosion in sprinkler system piping can be a costly problem if leaks occur, causing damage to the interior of a structure, according to Matt Klaus, Principal Fire Protection Engineer with the National Fire Protection Association. 

Replacing piping is no small expense, either. Corrosion can also cause blockages in the piping network, which can lead to an ineffective sprinkler system during a fire.

Corrosion can take on many forms, including oxidation, microbiologically influenced corrosion, and galvanic corrosion. The technical committees responsible for NFPA 13, Installation of Sprinkler Systems, have been looking at ways to eliminate or reduce corrosion in sprinkler systems for several revision cycles.

Reducing corrosion in dry systems can be achieved by eliminating all of the water from these systems after testing/activation and using alternative gases like nitrogen for charging these systems. For wet systems, limiting the amount of air in the system is the goal. Air trapped in pressurized sprinkler system piping results in an increase in the concentration of dissolved oxygen in the piping, enabling corrosion. Venting the trapped air in a wet system reduces this problem, so a revision to the wet system sprinkler system standard requires that a single air vent be installed for each system.

Depending upon the building geometry and sprinkler design, it is possible to trap air in many locations in the system, meaning a single vent may not be effective. Therefore, some stakeholders believe that the requirement adds cost to the property owner and the design team without any assurance that there is a long-term benefit to the system.

More tips and advice from the NFPA.

Related Stories

Codes and Standards | Feb 14, 2020

At least 13 states create incentives for utilities to use demand response programs

Practice optimizes power grid, incorporates more renewable power.

Codes and Standards | Feb 13, 2020

Living Future Institute’s JUST program helps measure progress on sustainability, social justice

Functions as a transparency platform for organizations to disclose their operations.

Codes and Standards | Feb 12, 2020

Commercial Building Energy Saver Wins R&D 100 Award

Software toolkit enables access to deep energy retrofit and zero-net energy strategies.

Codes and Standards | Feb 11, 2020

Fenestration Rating Council launches faster energy performance testing system

New windows, doors, and skylights will get to market faster.

Codes and Standards | Feb 7, 2020

Landlords scramble to comply with the New York City Council’s Climate Mobilization Act (CMA)

Intent is to reduce greenhouse gas emissions; improve efficiency for buildings larger than 25,000 sf.

Codes and Standards | Feb 6, 2020

New document to determine THERM finite element modeling surface temperatures released

Process often used to predict interior surface temperatures on fenestration.

Codes and Standards | Feb 5, 2020

HUD issues guidance on emotional support animals

Clarifies the responsibilities of rental housing providers and renters.

Codes and Standards | Jan 31, 2020

Colorado ranks first in LEED Top 10 states

Rankings of states for LEED certified square feet per person released.

Codes and Standards | Jan 30, 2020

Dramatic demographic shifts poised to alter global workplace

By 2030, Millennials and Generation Z will dominate workforce.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021