flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

How does your firm’s hit rate stack up to the AEC competition?

Building Team

How does your firm’s hit rate stack up to the AEC competition?

If your firm is not converting at least a third of project proposals when competing for new work, it may be time to reassess your marketing tactics and processes.


By BD+C Staff | January 3, 2017

Photo: Pixabay

New research from the Society for Marketing Professional Services Foundation (SMPS Foundation) finds that average AEC firm hit rate—measured most commonly as the total number of proposals submitted to the total number of projects won—falls within the 37-44% range, depending on the discipline. Engineering firms have the highest average hit rate, at 44.2%. Construction firms have the lowest average hit rate, at 37.9%.

The 22-page report, Measuring for Success: A Look at Hit Rates & Other KPIs in the A/E/C Industries, evaluates the tools and processes that AEC firms use to track marketing success. The findings and analysis are based on a survey of 303 U.S.-based AEC firms conducted by the SMPS Foundation in conjunction with the Southern Illinois University Edwardsville Master of Marketing Research program.

“While there are many variables in tracking hit rates throughout AEC industries, there is a benefit to having a metric for evaluating a firm’s progress,” wrote the report’s authors. “The hit rate provides a baseline over time for firms to improve their success rate and should be used in conjunction with other key performance indicators such as profitability, market trends, and backlog.”

The report addresses a variety of topics, including:
• Methods and metrics AEC firms utilize to track their success of winning projects
• How firms use the hit rate metric to improve future performance
• Alternative key performance indicators
• Effectiveness of hit rate and other KPIs
• Barriers to developing a benchmarking standard for AEC firms
• It concludes with takeaways and action steps for AEC firms.

SMPS members receive a complimentary download of the report once they log on to smps.org.

Nonmembers may download the report with a donation of $24.95 until January 31, 2017.

Source: SMPS Foundation

 

 

Related Stories

| Jan 16, 2012

Suffolk completes construction on progressive operating suite

5,700 square-foot operating suite to be test bed for next generation of imaged-guided operating techniques.

| Jan 3, 2012

Callison acquires Barteluce Architects & Associates

This acquisition will grow Callison’s New York team to over 75 architects.

| Jan 3, 2012

New Chicago hospital prepared for pandemic, CBR terror threat

At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters. 

| Jan 3, 2012

The Value of Historic Paint Investigations

An expert conservator provides a three-step approach to determining a historic building’s “period of significance”—and how to restore its painted surfaces to the correct patterns and colors. 

| Jan 3, 2012

Art Gensler: Still Making a Difference for Clients Every Day

After running what is today the largest architecture firm in the world for more than four decades, M. Arthur Gensler, Jr., FAIA, FIIDA, RIBA, is content to be just another employee at the firm that bears his name. 

| Dec 27, 2011

Clayco awarded expansion of Washington University Data Center in St. Louis

Once completed, the new building addition will double the size of the data center which houses sophisticated computer networks that store massive amounts of genomic data used to identify the genetic origins of cancer and other diseases. 

| Dec 21, 2011

DOE report details finance options for PV systems in schools

The report examines the two primary types of ownership models used to obtain PV installations for school administrators to use in selecting the best option for deploying solar technologies in their districts.

| Dec 16, 2011

Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University

The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration. 

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 9, 2011

BEST AEC FIRMS 2011: EYP Architecture & Engineering

Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021